2460192

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

the shed as constructed and permission for an extension to the existing dressing rooms

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Mar 2024

  2. Decision: CONDITIONAL

    10 May 2024

  3. Decision due

    13 May 2024

  4. Grant issued

    13 Jun 2024

Application Details

Location
Gortarush Upper , Dundrum , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
4.3 ha

Timeline

Registration Date
19 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 May 2024
Grant Date
13 June 2024
Permission Expires
12 June 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

256m
18600413N/A6 Apr 2018

retention for the change of use of the public office to residential use at the former garda station/constabulary barracks.

Garryduff , East Dundrum , Co. Tipperary

267m
2260490CONDITIONAL15 Sept 2022

a shared vehicular entrance, 2 dwelling houses, connections to main services together with all associated site works

Garryduff East , Dundrum , Co. Tipperary

271m
18600523CONDITIONAL27 Apr 2018

retention for the change of use of the public office to residential use at the former Garda Station/ Constabulary Barracks, a listed protected structure (S021)

Garryduff East , Dundrum , Co. Tipperary

328m
2660773N/A8 Aug 2026

the change of use of a domestic dwelling house to short-term holiday accommodation and all associated site works. The building is a Protected Structure reference no. 1430

Garryduff East , Dundrum , Co. Tipperary

328m
2460339CONDITIONAL3 May 2024

(1) the change of use of Dundrum school and court house into a domestic dwelling house (The building is a Protected Structures reference 1430), (2) repair of the existing roof, chimney, windows, doors and external structures, (3) the change of internal layout (4) the upgrade of driveways, entrances & repair boundary wall and all associated site works

Garryduff East , Dundrum , Co. Tipperary

348m
2260477N/A13 Sept 2022

(1) the side entrance as erected at Northeast of the site and (2) the timber fence erected to separate the creche from the back yard and planning permission for change of use of the warehouse section of the building to the north of the creche from storage associated with the creche to generally light warehouse storage

Gortarush Upper , Dundrum , Co. Tipperary

365m
2260491CONDITIONAL16 Sept 2022

(1) the side entrance as erected at Northeast of the site and (2) for the timber fence erected to separate the creche from the back yard and for planning permission for change of use of the warehouse section of the building to the north of the creche from storage associated with the creche to generally light warehouse storage

Gortarush Upper , Dundrum , Co. Tipperary

387m
2460289CONDITIONAL19 Apr 2024

2 additional bays as constructed to the existing sports hall and the athletic track as constructed. Permission is also sought for a one bay extension to the existing sports hall and for the provision of flood lighting to the athletic track

Gortarush Upper , Dundrum , Co. Tipperary

392m
2460497CONDITIONAL20 Jun 2024

the construction of a house, domestic entrance, domestic shed, waste water treatment system and associated site works

Woodleigh , Dundrum , Co. Tipperary

402m
2561309CONDITIONAL16 Dec 2025

the construction of a single-storey light industrial building for the purposes of fabrication, blasting and painting of structural steel components with associated compressor room, generator room, low voltage (LV) electrical room, ESB substation and diesel tank, car park and all associated works

Dundrum Steel RHD Limited , Garryduff East , Dundrum Co. Tipperary