Proposed Development
A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
View the full application file on the council's planning portal →Application Timeline
Application received
19 Jul 2024
Further information requested
12 Sept 2024
Further information received
28 Feb 2025
Decision due
24 Apr 2025
Decision: CONDITIONAL
24 Apr 2025
Grant issued
27 May 2025
Application Details
- Location
- In the townlands of Ballybar Lower Ballybar Upper , Ballycarney Ballyloo , Linkardstown Park and Tinryland
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Carlow County Council
- Site Area
- 73 ha
Timeline
- Registration Date
- 19 July 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 April 2025
- Grant Date
- 27 May 2025
- Permission Expires
- 26 May 2035
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to retain the demolition of a garage, a new garage and the relocation of the entrance and all associated site works
Ballybar Lower , Tinryland , Co. Carlow
Permission to retain the demolition of a garage, a new garage and the re-location of the entrance and all associated site works
Ballybar Lower , Tinryland , Co. Carlow
Permission to retain existing 56 sq. m garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works
Ballybar Lower , Tinryland , Co. Carlow
to retain existing 56 sq. m garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works
Ballybar , Tinryland , Co. Carlow
to retain an existing garage and to construct an extension to include an extended kitchen, a bedroom a sitting room, associated rooms and all associated site works
Ballybar Lower , Tinrlyand , Carlow
to retain existing garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works
Ballybar , Tinryland , Co. Carlow
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
In the townlands of Ballybannon Ballybar Lower Ballybar Upper Ballycarney , Ballyloo Cloghna Linkardstown and Park , in County Carlow.
to demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
Ballycarney , Co. Carlow
Retention permission is sought for the as built detached domestic garage to the rear of existing dwelling and all associated site development works
Tinryland , Carlow , Co Carlow
the retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow
Park , Tinryland , Carlow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?