2460205

CONDITIONAL

Carlow - Carlow County Council

Proposed Development

A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jul 2024

  2. Further information requested

    12 Sept 2024

  3. Further information received

    28 Feb 2025

  4. Decision due

    24 Apr 2025

  5. Decision: CONDITIONAL

    24 Apr 2025

  6. Grant issued

    27 May 2025

Application Details

Location
In the townlands of Ballybar Lower Ballybar Upper , Ballycarney Ballyloo , Linkardstown Park and Tinryland
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Site Area
73 ha

Timeline

Registration Date
19 July 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 April 2025
Grant Date
27 May 2025
Permission Expires
26 May 2035

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

742m
2151CONDITIONAL19 Feb 2021

Permission to retain the demolition of a garage, a new garage and the relocation of the entrance and all associated site works

Ballybar Lower , Tinryland , Co. Carlow

742m
20454N/A15 Dec 2020

Permission to retain the demolition of a garage, a new garage and the re-location of the entrance and all associated site works

Ballybar Lower , Tinryland , Co. Carlow

742m
20216N/A30 Jun 2020

Permission to retain existing 56 sq. m garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works

Ballybar Lower , Tinryland , Co. Carlow

742m
20246N/A22 Jul 2020

to retain existing 56 sq. m garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works

Ballybar , Tinryland , Co. Carlow

742m
20323N/A18 Sept 2020

to retain an existing garage and to construct an extension to include an extended kitchen, a bedroom a sitting room, associated rooms and all associated site works

Ballybar Lower , Tinrlyand , Carlow

742m
20296N/A24 Aug 2020

to retain existing garage and to construct an extension to include an extended kitchen, a bedroom and sitting room, associated rooms and all associated site works

Ballybar , Tinryland , Co. Carlow

1.1km
2560137CONDITIONAL22 May 2025

A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

In the townlands of Ballybannon Ballybar Lower Ballybar Upper Ballycarney , Ballyloo Cloghna Linkardstown and Park , in County Carlow.

1.1km
20123CONDITIONAL14 Apr 2020

to demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works

Ballycarney , Co. Carlow

1.1km
2360003CONDITIONAL17 Jan 2023

Retention permission is sought for the as built detached domestic garage to the rear of existing dwelling and all associated site development works

Tinryland , Carlow , Co Carlow

1.2km
1780CONDITIONAL21 Mar 2017

the retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow

Park , Tinryland , Carlow

Planning a project of your own?