2460241

CONDITIONAL

Kilkenny - Kilkenny County Council

Proposed Development

for a Battery Energy Storage System (BESS) in the townland of Moatpark, Ballyragget, Co. Kilkenny. The development will consist of; • A 10-year Planning Permission and an operational life of 35 years • 29 units of 8 containers on concrete plinth foundations containing batteries and related equipment • 29 no. prefabricated modular power conversion units • Containerised power transformers • Underground electrical and communications cabling • Upgrade of existing site access • Provision of on-site access tracks • 1 no. temporary construction compound • 4 no. spare parts containers • All associated and ancillary site development, lighting, perimeter fence, landscaping, drainage and CCTV. The planning application will be accompanied by a Natura Impact Statement (NIS).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 May 2024

  2. Further information requested

    19 Jul 2024

  3. Further information received

    11 Nov 2024

  4. Decision: CONDITIONAL

    10 Dec 2024

  5. Decision due

    12 Dec 2024

  6. Grant issued

    21 Jan 2025

Application Details

Location
Moatpark , Ballyragget , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
3.11 ha

Timeline

Registration Date
27 May 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 December 2024
Grant Date
21 January 2025
Permission Expires
20 January 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

212m
2460534CONDITIONAL7 Nov 2024

for a 2000sq.m extension to the existing Ballyragget 110kV Substation compound including; Site clearance works including the removal of existing palisade fence along the North and West boundaries and demolition of an existing Interface Transformer bund foundation. Provision of new electrical plant and equipment including: 1 No. Power Transformer, associated bund and firewall (c. 67 m2, 5.6 m high), 1 No. 20 / 10 kV Interface Transformer and associated bund (c. 25 m2, and 2.25 m high), 1 No. Arc Suppression Coil and associated bund (c. 18 m2, and 4.0 m high), a 38 kV busbar plinth with 3 No. cubicles and associated cable sealing ends (c. 6.5 m high), associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; Site development works including provision of extension of lighting, internal access road, new fencing, provision of site services including drainage; and all other ancillary works

Ballyragget 110kV Substation , Moatpark , County Kilkenny

235m
18619N/A18 Sept 2018

for the retention of extension to dwelling and all associated site works at

Moatpark , Ballyragget , Co. Kilkenny

235m
18729CONDITIONAL1 Nov 2018

for the retention of extension to dwelling and all associated site works at

Moatpark , Ballyragget , Co. Kilkenny

253m
2460221CONDITIONAL17 May 2024

a 10-year planning permission and a 35-year operational life for an energy storage facility comprising (i) energy storage containers installed on concrete plinth foundations; (ii) electrical transformers; (iii) underground electrical and communications cabling; (iv) provision of a new access point from the R432; (v) on-site access track; (vi) security fencing and security gates; (vii) pole-mounted security cameras; (viii) ancillary electrical equipment and storage containers including a staging area; and, (ix) all associated and ancillary site development, drainage, landscaping and reinstatement works. This planning application is accompanied by a Natura Impact Statement.

Moatpark , Ballyragget , Co. Kilkenny

262m
2560144CONDITIONAL25 Mar 2025

for development at this site. The development will consist of: A 10-year planning permission and a 35-year operational life for (i) a compound (with a total footprint of approximately 1,080 square metres [m2]) with a hardcore surface enclosed by security fencing and gates; (ii) a 110kV electricity transformer and associated electrical plant and equipment; (iii) an electrical control building (with a total gross floor area of 64m²) containing electrical plant and equipment; (iv) underground electrical cabling to connect the permitted Ballyragget Power Reserve (Kilkenny County Council Planning Register Reference 24/60221) to the electrical control building and to connect the 110kV electricity transformer to the existing Ballyragget 110kV electricity substation; and (v) all associated ancillary site development works. This planning application is accompanied by a Natura Impact Statement

Moatpark , Ballyragget , Co. Kilkenny

285m
21882CONDITIONAL26 Oct 2021

for the installation of 2 new cooling tower units and associated concrete bases at the existing Waste Water Treatment Plant and associated ancillary site works. Upgrade works to the existing watermain consisting of the installation of a new watermain connecting existing water reservoir tank in the Glanbia Milk Processing Facility to the existing pump house including the crossing of the N77 public road and all ancillary site works. Upgrade of the existing effluent line to include the construction of a new effluent line connection from the Glanbia Milk Processing Facility and the existing Waste Water Treatment Plant including a crossing of the N77 public road and all ancillary site works. Installation of services across the N77 public road and all ancillary site works. The milk processing facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement has been prepared and accompanies this application

Ballyconra , Ballyragget , Co. Kilkenny

324m
22687CONDITIONAL20 Oct 2022

for development. The proposed development will consist of: Construction of two anaerobic digesters, one equalization tank to include concrete base, earth embankment and associated works; construction of biogas storage dome with biogas flare, desulfurization unit; construction of membrane and control building with yard slab and link road; construction of ferric chloride storage tank; installation of a new pipeline with underground and overground sections for the purpose of conveying renewable biogas to the Glanbia facility east of the N77 road; realignment of the existing internal road to facilitate vehicle movements; drainage works and all associated site works including landscaping. The dismantling and removal of an existing disused sludge mixing tank; dismantling and removal of an existing biotower. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application

Ballyconra , Ballyragget , Co Kilkenny

367m
20516CONDITIONAL7 Aug 2020

for development at this site. The development will consist of A Packaging Intake Building, A Butter Despatch comprising two butter despatch docks, An extension of the existing roadside boundary wall, Alterations to the existing building elevations, Associated site works. The proposed development will result in improved site safety, operational efficiency and containment of material deliveries and butter despatch. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency.

Ballyconra , Ballyragget , Co. Kilkenny

377m
21827CONDITIONAL4 Oct 2021

for the proposed installation of two new liquid storage silos for dairy products, relocation of an existing tank from internal to external, construction of a canopy for loading and unloading of raw materials and final product and associated works, construction of a new services pipe bridge between the proposed canopy and the proposed silos, reinstatement of concrete yard and all associated site works. The milk processing plant site holds and industrial emissions license issued by the Environmental Protection Agency

Ballyconra , Ballyragget , Co. Kilkenny

386m
21519CONDITIONAL14 Jun 2021

for development which will consist of : An extension to the existing Bio Solids De-watering Building for the installation of new equipment and material storage along with a new external silo and associated concrete bund: a new concrete yard to access the building extension and all associated effluent and storm drainage networks: new security fencing and sliding gate and modifications to the existing entrance: replacement of existing Dissolved Air Flotation (DAF) system with a new DAF System; landscaping and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. The application will be accompanied by a Natura Impact Statement (NIS).

Ballyconra , Ballyragget , Co. Kilkenny