The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2460254

CONDITIONAL

Clare - Clare County Council

Proposed Development

for a connection to the public sewerage system for an existing single dwelling

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 May 2024

  2. Further information requested

    22 Jul 2024

  3. Further information received

    5 Feb 2025

  4. Decision: CONDITIONAL

    3 Mar 2025

  5. Decision due

    4 Mar 2025

  6. Grant issued

    8 Apr 2025

Application Details

Location
Garraun , Parteen , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.22 ha

Timeline

Registration Date
30 May 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 March 2025
Grant Date
8 April 2025
Permission Expires
7 April 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

286m
24204CONDITIONAL21 Jun 2024

to construct dwelling house, garage, entrance, connect to all public services and all associated site works

Fairyfield , Parteen , Co Clare

287m
2560657CONDITIONAL28 Oct 2025

for change of house design and layout from that permitted under planning permission reference No. P24/204 and associated changes to the site layout

Fairyfield , Parteen , Co. Clare

318m
19211CONDITIONAL25 Mar 2019

for a change of use from an existing commercial unit to a Preschool at the premises known locally as the "Supermarket", R464, Parteen Village, Co. Clare. Works to include the following: 1. Changes to the existing front elevation ( West facing Elevation ) to include the removal of all existing roller shutter blinds and fitting a new natural stone cladding. 2. The provision of 2 pedestrian safety barriers on the footpath outside the proposed Preschool. 3. The provision of a new pedestrian gate to the existing West facing boundary wall, 4. The provision of new doors and windows along the existing South and East facing elevations. 5. Replacing all existing signage with new signage to reflect the nature of the proposed preschool. 6. All ancillary site works

Parteen Village , Parteen , Co. Clare

326m
23124CONDITIONAL1 Mar 2023

for development which will consist of: 1. The removal of the front boundary wall to provide vehicle access for private parking purposes with suitable surface finish, 2. And all associated site works

No 6 Saint Judes Terrace , Parteen , Co Clare

341m
20344CONDITIONAL29 May 2020

for a single-family dwelling and associated site works and services connections

Fairyhill , Parteen , Co Clare

370m
19158CONDITIONAL6 Mar 2019

for the construction of a playground area ( circa 120sq.m ), perimeter fencing, drainage and all associated site works at Parteen National School.

Parteen , Co. Clare

407m
2560051CONDITIONAL10 Feb 2025

for a new single storey dwelling house, new domestic garage, new site entrance adjacent to the existing site entrance to serve the existing neighbouring dwelling at Kincora House and all ancillary site works above and below ground

Ballykeelaun , Parteen , Co. Clare V94 N6T2

421m
2178CONDITIONAL5 Feb 2021

for a new part single storey, part two storey dwelling house with garage and associated landscaping boundary walls, fences, entrance, and all associated site services and works

Parteen , Co Clare

425m
221114CONDITIONAL8 Dec 2022

for a two storey house, reduced in size from that previously granted (pl. Ref. P17/853), and associated site works and services connections

Fairyhill , Parteen , Co Clare

442m
2360316CONDITIONAL17 Aug 2023

for the following: 1. Demolish existing shed to facilitate a rear extension to the existing dwelling. 2. Widen the existing vehicular entrance. 3. Elevational changes to the house. 4. All ancillary site works

School Road , Parteen , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?