2460274

N/A

Cavan - Cavan County Council

Proposed Development

of 1. Constructing a 1 bed kitchen diner ground floor extension (154.5sqm) to the existing dwelling 2. To reconfigure the interior of the existing dwelling with minor alterations externally which include blocking up the front door 3. To decommission the existing sewage system and upgrade to a new BAF Sewage Treatment System with percolation area and with all ancillary site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jun 2024

  2. Further information requested

    9 Aug 2024

  3. Application withdrawn

    18 Feb 2025

Application Details

Location
Kilnaleck , Kill , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.069 ha
Floor Area
201.2 sq m
Residential Units
1

Timeline

Registration Date
19 June 2024
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
18 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

244m
2522CONDITIONAL7 May 2025

to construct a two storey type dwelling with a detached domestic garage sewerage treatment unit percolation area erect new entrance walls and piers and all associated site works

Kill , Kilnaleck , Co Cavan

318m
2660417N/A29 Jul 2026

for 1) Change of use of existing detached domestic garage to dwelling, 2) Erection of single storey extension to the front and side, 3) Alterations to the existing plans and elevations, 4) All ancillary site works

Kill , Kilnaleck , Co. Cavan

510m
2360229CONDITIONAL16 Oct 2023

to RETAIN and complete alterations to existing floor plans and elevations of existing dwelling, also planning PERMISSION sought to erect extension to the rear, erect detached domestic garage with carport and install sewage treatment facilities, complete entrance and siteworks and all ancillary works granted under previous planning reference 06362

Kill , Kilnaleck , Co. Cavan

510m
2360129N/A4 Aug 2023

to alter floor plans and elevations of existing dwelling, erect extension to the rear, erect detached domestic garage with carport and install sewage treatment facilities, complete entrance and siteworks and all ancillary works granted under previous planning reference 06362

Kill , Kilnaleck , Co. Cavan

535m
2297CONDITIONAL10 Mar 2022

to construct a biomass boiler house and ancillary storage silo, site services and development works

Kill , Kilnaleck , Co. Cavan

634m
23265CONDITIONAL27 Jul 2023

to install a 200KV ground mounted PV array, associated mounting frames, site services and development works

Kill , Kilnaleck , Co Cavan

837m
2560555CONDITIONAL11 Sept 2025

for 12 number single storey timber pitched roof shed buildings each with a metal fenced external area attached to each shed building. The sheds are to be used to house the animals for the purpose of the business

Drumbee , Kilnaleck , Co Cavan

880m
2360047CONDITIONAL7 Jun 2023

for alterations to an existing dwelling to include the demolition of front porch structure and rear extension, the construction of a part two storey, part single storey extension to the rear, amendments to the front elevation, the construction of an attached carport and domestic garage, new site entrance including new entrance gates and piers, upgrade of existing waste water treatment system with percolation area and all associated site works

Drumbee , Kilnaleck , Co. Cavan

885m
19519CONDITIONAL20 Dec 2019

construct agricultural shed which will consist of a slatted area with slurry holding tank underneath, dungstead and all associated site works

Kill , Kilnaleck , Co Cavan

1.0km
21394N/A28 Jun 2021

for the construction of a dwelling house, story and a half in structure, together with domestic garage(double) with external covered area and ancillary site works serviced by existing water supply and domestic sewage treatment system

Kill Demesne , Kilnaleck

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.