The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460290

N/A

Kerry - Kerry County Council

Proposed Development

THE DEVELOPMENT WILL CONSIST OF THE INSTALLATION OF A 6-METRE TELECOMMUNICATIONS POLE SUPPORT STRUCTURE CARRYING 2 NO. DISHES, ASSOCIATED EQUIPMENT, TOGETHER WITH GROUND-BASED EQUIPMENT CABINET, CONCRETE FOUNDATION, WOODEN FENCE, ACCESS TRACK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT WILL PROVIDE FOR HIGH-SPEED WIRELESS DATA AND BROADBAND SERVICES. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED IN SUPPORT OF THIS PLANNING APPLICATION.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 May 2024

  2. Further information requested

    2 Jul 2024

  3. Further information received

    18 Dec 2024

  4. Application withdrawn

    8 Apr 2025

Application Details

Location
Dunloe Upper Beaufort , Killarney , Co. Kerry
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.002 ha

Timeline

Registration Date
10 May 2024
Status
WITHDRAWN
Decision
N/A
Withdrawn
8 April 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

949m
2460260CONDITIONAL29 Apr 2024

The installation of a 12-metre telecommunications pole support structure carrying 1 no. dish, associated equipment, together with ground-based equipment cabinet, concrete foundation, stock proof fence and all associated site development works. the development will provide for high-speed wireless data and broadband services.

Dunloe Upper Beaufort , Killarney , Co. Kerry

952m
2460392CONDITIONAL18 Jun 2024

The development will consist of the installation of a 12-metre telecommunications pole support structure carrying 1 no. dish, associated equipment, together with ground-based equipment cabinet, concrete foundation, stock proof fence, fibre chambers, fibre supply ducting, ESB ducting and all associated site development works within revised stie boundaries. The development will provide for high-speed wireless data and broadband services. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application.

Dunloe Upper Beaufort , Killarney , Co. Kerry

972m
171232CONDITIONAL12 Dec 2017

CONSTRUCT A SHEEP HOUSE COMPLETE WITH EFFLUENT TANK & AN ANCILLARY CONCRETE STRIP ALONG THE WORKING SIDE FOR MANAGING MY SHEEP FLOCK ON MY FARM

GAP OF DUNLOE UPPER , BEAUFORT , KILLARNEY

1.5km
20387CONDITIONAL29 Apr 2020

TO (A) MAKE ALTERATIONS AND CONSTRUCT EXTENSIONS TO EXISTING DWELLING HOUSE AND (B) DECOMMISSION EXISTING SEPTIC TANK AND INTALL A NEW SEPTIC TANK AND PERCOLATION AREA

DUNLOE UPPER , BEAUFORT , KILLARNEY

1.6km
23219CONDITIONAL28 Feb 2023

(1) RETAIN DWELLING HOUSE AND BASEMENT AS CONSTRUCTED, (2) PERMISSION TO CONSTRUCT EXTENSION, (3) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL NEW WASTE WATER TREATMENT UNIT AND POLISHING FILTER, ALL IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED

DUNLOE UPPER , BEAUFORT , CO KERRY

1.6km
17694CONDITIONAL19 Jul 2017

CONSTRUCT A DWELLING HOUSE AND WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS

DUNLOE UPPER , BEAUFORT , KILLARNEY

1.6km
2660408CONDITIONAL8 May 2026

build a dwelling house and install a mechanical treatment unit and polishing filter

Dunloe Upper , Beaufort Killarney , Co. Kerry

1.6km
19450CONDITIONAL30 Apr 2019

RETAIN ELEVATIONAL CHANGES TO EXISTING DWELLING HOUSE WITHIN REVISED SITE BOUNDARIES

DUNLOE UPPER , BEAUFORT , CO.KERRY

1.8km
231080CONDITIONAL2 Nov 2023

RETAIN EXISTING DWELLING, STORAGE SHED AND ALL ASSOCAITED SITE WORKS WITHIN REVISED SITE BOUNDARIES

DUNLOE UPPER , BEAUFORT , CO KERRY

1.8km
23946CONDITIONAL30 Aug 2023

(A) CONSTRUCT A NEW DWELLING HOUSE WITH GARAGE (B) PLANNING PERMISSION TO CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE SERVICES

Dunloe Upper , Beaufort , Co Kerry

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?