2460305
CONDITIONALClare - Clare County Council
Proposed Development
for development at this site; Armada House, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The development will consist of the provision of a footpath between Armada House and the R482. The development will also include for associated landscaping, public lighting, the opening of a new 2m wide pedestrian access that links to the public footpath as well as all ancillary works.
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jul 2024
Decision due
26 Aug 2024
Decision: CONDITIONAL
26 Aug 2024
Grant issued
1 Oct 2024
Application Details
- Location
- Armada House , Leagard South , Spanish Point Co. Clare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Site Area
- 0.08 ha
Timeline
- Registration Date
- 2 July 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 August 2024
- Grant Date
- 1 October 2024
- Permission Expires
- 30 September 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development at Spanish Point House, Spanish Point, Co. Clare which is a protected structure, the development will consist of a 20SqM single storey porch extension to the west/side and replace an existing window with a door to the east/courtyard side of the kitchen; a 5 SqM single storey porch extension, replace existing door with window, form new fire escape door within existing window opening and covered canopy area all to the west/courtyard side of the detached outbuilding; change of use 20SqM of part of existing bedroom accommodation as visitor toilets; retain existing 16.5 SqM single storey extension to the rear/north; retain existing canopy in the courtyard; retain single storey bay window 5 SqM to the south/ front of the detached outbuildings, and retain the timber cladding as installed to the former Marian Way; additional car parking and existing sewage treatment plant capacity to service increased intensity of use of overall development.
Spanish Point , Co. Clare
for development at Armada House Leagard South, Spanish Point, Co Clare which is a protected structure. The works involve the following a) new pedestrian path b) new opening on the existing stone wall c) setback a section of the existing stone boundary wall d) low lights beside the new pedestrian path along with associated site works
Armada House , Leagard South , Spanish Point Co Clare
for development at this site at the Armada Hotel and Armada House (which is a protected structure, RPS No. 025), Spanish Point, Miltown Malbay, Co. Clare. The development will consist of – 1) The construction of an under-ground wastewater treatment plant including associated overground plant, 2) The construction of an under-ground pumping station, and 3) All associated site development works, including underground piping, landscaping and the decommissioning and removal of the existing wastewater treatment plant. This planning application is accompanied by a Natura Impact Statement (NIS)
Armada Hotel and Armada House , Spanish Point Miltown Malbay , Co. Clare
and PERMISSION for development at Armada House, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The development consists/will consist of:i. The retention of 1 no. bay window (5 sq. m) to the southeast of the residential amenity rooms (Stable Rooms); ii. The retention of a single-story extension to the rear of the house (16.5 sq.m); iii. The retention of a timber pergola located in the internal courtyard; iv. The retention of widening works to the car park to the north, associated concrete post and rail fence and 3 no. external lampposts; v. The retention of c. 95 sq. m of wooden cladding along ‘Marian Way’; vi. The development of a porch extension (20 sq. m) to the west gable of the house; vii. The development of a porch extension (5 sq.m) to the east of the courtyard; viii. The replacement of an existing window with a door to the east of the kitchen to provide access to the internal courtyard; ix. The replacement of an existing door with window to the west of the internal courtyard; x. The replacement of existing window with a proposed fire escape door to the east of the courtyard and, xi. Internal alterations to provide for a toilet facility (20 sq.m) to the northwest of the internal courtyard as well as the provision of a new door to the east elevation and the alteration of an existing door to a window to the north of the internal courtyard.
Armada House , Spanish Point , Co. Clare
for development at Armada House, Leagard South, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The works involve installing an external fire escape stairs in the internal courtyard, replacing two existing windows with two doors to allow for access onto the external stairs, a roller shutter over an existing window in the courtyard and to move the boiler house door to the side elevation along with associated site works
Armada House , Leagard South Spanish Point , Miltown Malbay Co. Clare
for development which will consist of the removal of the existing septic tank and the installation of a new septic tank and sewage treatment system , with 3 No. 5M flag poles, at MacAuley House, which is a Protected structure
Leagard South , Spanish Point , Co Clare
to alter the elevations of an existing office an to change its use from an office to a cafe ancillary to the existing Armada Hotel Complex along with associated site works
Armada Hotel , Spanish Point , Co Clare
to construct a standalone structure that will be used for offices and storage ancillary to the existing Armada hotel Complex along with associated site works
Armada Hotel , Spanish Point , Co Clare
to construct/install a cabin to be used as short-term tourist accommodation ancillary to the existing Armada Hotel Complex and to install a waste water storage tank along with associated site works
Armada Hotel , Spanish Point , Miltown Malbay
for the following a) to construct an extension and outside winter garden area to the bar/dining room area on the south elevation b) to construct an extension and outside terrace area to the pre-wedding reception area on the south elevation along with associated site works
Armada Hotel , Spanish Point , Co Clare