2460314

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

DECOMMISSIONING EXISTING SEPTIC TANK SYSTEM AND REPLACEMENT WITH NEW SEPTIC TANK, REED BED AND WETLAND AREA

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Mar 2024

  2. Further information requested

    25 Apr 2024

  3. Further information received

    8 May 2024

  4. Decision: CONDITIONAL

    23 May 2024

  5. Decision due

    4 Jun 2024

  6. Grant issued

    26 Jun 2024

Application Details

Location
ROSSMORE , DONEGAL TOWN , CO. DONEGAL
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.262 ha

Timeline

Registration Date
12 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 May 2024
Grant Date
26 June 2024
Permission Expires
25 June 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

206m
2050420N/A27 Mar 2020

CONSTRUCTION OF A SLATTED SHED UNIT AS AN EXTENSION TO EXISTING FARMYARD BUILDING AND MEAL STORE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

ROSSMORE , DONEGAL TOWN , DONEGAL PO

208m
2050501CONDITIONAL24 May 2020

CONSTRUCTION OF (1) A SLATTED SHED (2) MEAL STORE SHED IN ADDITION TO EXISTING FARMYARD COMPLEX AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

ROSSMORE , DONEGAL TOWN , DONEGAL PO

221m
1851618CONDITIONAL19 Oct 2018

ERECTION OF A 2 BAY SLATTED UNIT EXTENSION TO EXISTING AGRICULTURAL SHED PREVIOUSLY GRANTED PLANNING PERMISSION UNDER 06/21556 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

ROSSMORE TD , DONEGAL TOWN , DONEGAL PO

410m
1750003N/A4 Jan 2017

CONSTRUCTION OF A BRIDGE AND ALL ASSOCIATED SITEWORKS. A NATURA IMPACT STATEMENT WILL BE SUBMIITED WITH THIS APPLICATION

TULLYGALLEN , TULLYWEE , LAGHEY

411m
1750114CONDITIONAL31 Jan 2017

CONSTRUCTION OF A BRIDGE AND ALL ASSOCIATED SITEWORKS. A NATURA IMPACT STATEMENT WILL BE SUBMIITED WITH THIS APPLICATION

TULLYGALLEN , TULLYWEE , LAGHEY

411m
2151515UNCONDITIONAL29 Jul 2021

CONSTRUCTION OF A BRIDGE AND ALL ASSOCIATED SITEWORKS

TULLYGALLEN , TULLYWEE , LAGHEY

437m
2050447CONDITIONAL24 May 2020

(1) CONSTRUCTION OF A DWELLING HOUSE, (2) INSTALLATION OF A SECONDARY AND TERITIARY EFFLUENT TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD, (3) ERECTION OF AN AGRICULTURAL BUILDING WITH SLATTED TANK TO ACCOMMODATE SHEEP AND (4) ALTERATIONS AND WIDEN THE EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS (SITE ACCESS IS VIA A PROPOSED BRIDGE AS GRANTED PERMISSION UNDER 17/50114). A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

TULLYWEE AND TULLYGALLEN , LAGHY , DONEGAL PO

462m
1851093REFUSED16 Jul 2018

(1) ERECTION OF A DWELLING HOUSE, INSTALLATION OF A SECONDARY AND TERTIARY EFFLUENT TREATMENT SYSTEM,DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD, SITE ACCESS IS VIA A PROPOSED BRIDGE AS GRANTED PERMISSION UNDER 17/50114 AND (2) ALTERATION AND WIDENING OF THE EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS

TULLYWEE & TULLYGALLEN , LAGHY , DONEGAL PO

656m
2250138CONDITIONAL3 Feb 2022

UPGRADING OF EXISTING BINBANE TO CATHALEEN'S FALL 110KV OVERHEAD LINE CIRCUIT CONSISTING OF (1) REPLACEMENT OF (A) ("RESTRINGING") OF THE EXISTING OVERHEAD LINE CIRCUIT CONDUCTOR WIRES WITH NEW CONDUCTOR WIRES INCLUDING A FIBRE TELECOMMUNICATIONS CABLE (B) 106 NO. EXISTING POLESETS AND 17NO. ANGLE MASTS - ANY REPLACEMENT STRUCTURES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THEY WILL REPLACE, WILL BE ALONG THE SAME ALIGNMENT AS EXISTING, AND WILL BE OF A GENERALLY SIMILAR HEIGHT AND APPEARANCE UNLESS OTHERWISE STATED (C) 1 NO. EXISTING POLESETS WITH 1NO. 4 POLE POLESET IN THE TOWNLAND OF OUGHTNADRIN (2) THE REMOVAL OF 1 NO. ANGLE MAST IN THE TOWNLAND OF TULLY AND 1 NO. POLESET IN THE TOWNLAND OF CARRICK WEST (3) PROVISION OF 1NO. ANGLE MAST IMMEDIATELY ADJACENT TO CATHALEEN'S FALL SUBSTATION IN THE TOWNLAND OF BALLYHANNA (4) A LOCAL ALTERATION TO THE EXISTING CIRCUIT ALIGNMENT IN THE TOWNLANDS OF CLARCARRICKNAGUN AND DRUMMENNY MIDDLE WHICH WILL INVOLVE THE REPLACEMENT OF 2NO. EXISTING POLESETS WITH 2NO. ANGLE MASTS, AND THE REMOVAL OF 1NO. POLESET AND 2 NO. ANGLE MASTS (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FOUNDATION UPGRADE WORKS (6) ALL ASSOCIATED WORKS WITHIN THE EXISTING BINBANE AND CATHALEEN'S FALL SUBSTATIONS TO ACCOMMODATE THE UPRATED 110KV OVERHEAD LINE INCLUDING ALTERATIONS TO EXISTING APPARATUS (7) ALL ASSOCIATED TEMPORARY SITE DEVELOPMENT WORKS TO GAIN ACCESS TO THE EXISTING STRUCTURES INCLUDE CLEARANCE OF VEGETATION, DISASSEMBLY AND REASSEMBLY OF GATE POSTS / PIERS AND REMOVAL AND REINSTATEMENT OF EXISTING FENCING (8) OTHER TEMPORARY ASSOCIATED AND ANCILLARY SITE DEVELOPMENT WORKS REQUIRED FOR THE PURPOSE OF THE UPRATE OF THE EXISTING CIRCUIT, INCLUDING THE INSTALLATION OF SILT TRAPS, SILT FENCES, STONE TRACKS, BOG MATS AND TEMPORARY WATERCOURSE CROSSINGS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

TULLINLOUGH & MULTIPLE OTHER TOWNLANDS , DONEGAL PO , CO. DONEGAL

831m
2351659CONDITIONAL1 Nov 2023

CONSERVATORY BUILT TO THE SIDE OF EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKS

ROSSMORE & LEGACURRY , DONEGAL TOWN , CO. DONEGAL

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?