2460362
CONDITIONALTipperary - Tipperary County Council
Proposed Development
livestock housing sheds and all associated siteworks. Permission is sought to construct, a cubicle shed and calf shed with underground effluent storage tanks, including all associated sites works
View the full application file on the council's planning portal →Application Timeline
Application received
14 May 2024
Decision: CONDITIONAL
27 Jun 2024
Decision due
8 Jul 2024
Grant issued
31 Jul 2024
Application Details
- Location
- Ballinamona , Norwood , Nenagh Co Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 1.11 ha
Timeline
- Registration Date
- 14 May 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 27 June 2024
- Grant Date
- 31 July 2024
- Permission Expires
- 30 July 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
as built variations to previously approved planning permission reference 51/4686 consisting of: revised site boundaries, position and orientation of dwelling house and garage, extensions to the side and rear of the dwelling, position of septic tank/percolation area and 2 no. sheds to rear and PERMISSION to replace the existing septic tank and percolation area with a new wastewater treatment system, together with all associated site works
Ballincurry , Norwood , Nenagh Co. Tipperary
1) Additional area constructed to Domestic Garage granted under planning application PLC/22326, 2) Garden Shed and all associated site works
Grennanstown , Ballinamona , Nenagh
alterations to previously approved planning permission register reference 16/600228. The proposed alterations relate to the redesign of proposed new single storey extension to existing dwelling and all associated site works
Ballinamona , Kilkeary , Nenagh
a) removal of the existing single storey prefabricated portacabin classroom structure, b) construction of a new single storey prefabricated portacabin classroom structure complete with ramped/stepped access routes, c) connection to existing on site services, d) all associated site works - the development is located within the curtilage of recorded protected structure S649 Kilkeary National School
Kilkeary , Nenagh , Co Tipperary
a) proposed new single storey extension to the existing school building (b) associated alterations to existing school to accommodate proposed new extension & internal layout changes; c) connection to existing on site services; d) all associated site works
Kilkeary National School , Kilkeary , Nenagh
as constructed garage including all ancillary works
Kilkeary , Nenagh , Co. Tipperary
as constructed garage including all ancillary works
Kilkeary , Nenagh , Co. Tipperary
dwelling house, garage, new effluent treatment system, new entrance and all associated site works
Ballincurry , Norwood , Nenagh
the existing domestic garage together with all associated site works
Kilkeary , Nenagh , Co. Tipperary
RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of 160m, a hub height of 92m, a rotor diameter of 136m and all associated foundations. - A permanent meteorological mast with an overall height of 92m - Turbine and meteorological mast temporary and permanent hard-standing areas including crane hardstand areas; - Upgrade of an existing farm entrance and access track off the R498 regional road to the south of the site in the townland of Grenanstown, to serve as construction and operation access; - Upgrade and widening of existing internal tracks and provision of new permanent and temporary site access tracks and all associated site drainage; - 1 no. borrow pit and associated drainage infrastructure to be used as a source of stone material during construction; and as a permanent material storage area. - Construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing - A permanent 38kV on-site substation to include control building with electrical infrastructure, welfare facilities, car parking, security fencing and lighting, and all associated infrastructure, services, and site works. - All associated underground electrical and communications cabling connecting the turbines to the proposed on-site 38kV substation. - Underground grid connection between the onsite 38 kV substation and the existing Nenagh 110 kV substation comprising approximately 0.75km within the windfarm, 6.2km along the R498, and 1.1km along the L5136. - Biodiversity enhancement areas - All associated site works above and below ground, including site clearance, site drainage, security gates, fencing, permanent and temporary signage, landscaping and revegetation
Townlands of Coolderry Grenanstown Ballinamona Knockbrack Kilconane Kilkeary Ballygasheen Knockalton Upper Lisbunny Tyone and Lissatunney , Nenagh , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?