The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460366

N/A

Kildare - Kildare County Council

Proposed Development

for construction of 3 nr. single storey detached dwellings to include civil engineering works to achieve proposed construction levels; roads; footpaths; boundary treatments; landscaping works along with all associated site development and facilitation works

View the full application file on the council's planning portal →

Application Details

Location
Site No. 5 6 & 7 Lis na Dara , Cutbush , Curragh
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.61 ha
Floor Area
439.5 sq m
Residential Units
3

Timeline

Registration Date
25 April 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
2561041CONDITIONAL10 Sept 2025

for change of house type to that previously approved under planning permission 24/60385 on sites 5,6 & 7 along with all associated site development and facilitation works

Site No. 5 6 & 7 Lis na Dara , Cutbush , Curragh

18m
2460385CONDITIONAL30 Apr 2024

for the construction of 3 nr. single storey detached dwellings to include civil engineering works to achieve proposed construction levels; roads; footpaths; boundary treatments; landscaping works along with all associated site development and facilitation works. Revised by Significant Further Information which consists of alterations to layout and house design

Site No. 5 6 & 7 Lis na Dara , Cutbush , Curragh

67m
18490CONDITIONAL27 Apr 2018

the construction of two number single storey bungalows (Type A – 4 bedroom and Type B – 3 bedroom). Permission to complete existing access road, permission to erect an agricultural style shed for temporary use as a builder’s store and compound and subsequent permanent use as an agricultural shed, connection to public foul sewer and all associated site works

Ballyfair , Cut Bush , The Curragh

77m
1977CONDITIONAL30 Jan 2019

amendment to the finished floor levels of previously approved houses granted under 18/490, amendment is to raise the finished floor level by 1 metre from the approved development to aid connection to existing and permitted foul sewage system and all associated site works

Ballyfair , Cut Bush , The Curragh

95m
18489CONDITIONAL27 Apr 2018

the construction of a single storey bungalow, connection to public foul sewer and all associated site works

Ballyfair , Cut Bush , The Curragh

98m
171034CONDITIONAL15 Sept 2017

single storey extension to the rear and side of the property measuring 35 square metres and all associated site works

Ballyfair Lodge , Ballysax , Co. Kildare

102m
20517CONDITIONAL26 May 2020

construction of a single storey side extension to existing detached single storey house and all associated site works

Ballyfair , Cutbush , The Curragh

145m
201197CONDITIONAL14 Oct 2020

a single storey extension to rear of existing single storey bungalow, minor alterations to front North elevation including removal of bay window, new story & a half domestic garage/ store and all ancillary site development works,

7 Clorane Brook , Cut Bush , Curragh

149m
201157N/A6 Oct 2020

a single storey extension to rear of existing single storey bungalow, minor alterations to front North elevation including removal of bay window, new storey & a half domestic garage/ store and all ancillary site development works,

7 Clorane Brook , Cut Bush , Curragh

150m
201099N/A25 Sept 2020

a single storey extension to rear of existing single storey bungalow, minor alterations to front north elevation including removal of bay window, new storey and a half domestic garage/store and all ancillary site development works

7 Clorane Brook , Cut Bush , Curragh

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?