2460369

CONDITIONAL

Kerry - Kerry County Council

Proposed Development

JFD Ltd. is applying to Kerry County Council for planning permission for four semi detached dwellings and all associated siteworks at Fountain Court Tralee, County Kerry.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jun 2024

  2. Decision: CONDITIONAL

    2 Aug 2024

  3. Decision due

    5 Aug 2024

  4. Appeal submitted

    16 Aug 2024

  5. Grant issued

    12 Dec 2024

  6. Appeal decided: CONDITIONAL

    12 Dec 2024

Application Details

Location
Fountain Court , Tralee , Co. Kerry
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.092 ha
Floor Area
16 sq m
Residential Units
4

Timeline

Registration Date
11 June 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 August 2024
Grant Date
12 December 2024
Permission Expires
11 December 2029

An Coimisiún Pleanála Appeal

Appeal Reference
320591-24
Decision
CONDITIONAL
Submitted
16 August 2024
Decided
12 December 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

228m
21203N/A2 Mar 2021

RETAIN EXISTING DWELLING IN PART ALL WITHIN REVISED BOUNDARIES

BALLINORIG WEST , TRALEE , COUNTY KERRY

228m
21476CONDITIONAL30 Apr 2021

RETAIN EXISTING EXTENSION TO DWELLING HOUSE

BALLINORIG WEST , TRALEE , CO KERRY

239m
24196CONDITIONAL20 May 2024

CHANGE OF USE OF PART OF THE EXISTING INDUSTRIAL BUILDING (CIRCA 9,000M2) FROM A WEAVING PLANT TO A WHISKEY MATURATION STORE AND ALL ANCILLARY SERVICES AND ASSOCIATED SITEWORKS . THE PROPOSED DEVELOPMENT IS FOR MODIFICATIONS TO AN ESTABLISHMENT TO WHICH THE MAJOR ACCIDENTS DIRECTIVE APPLIES

CLASH WEST (CLASH INDUSTRIAL ESTATE) , TRALEE , CO KERRY

239m
2253N/A24 Jan 2022

CONTRUCT THE FOLLOWING (1) NEW ESB SUB-STATION WITH ANCILLARY DRAINAGE ON THE EASTERN SIDE OF THE THEIR EXISTING INDUSTRIAL FACILITY AND (2) TWO NO. PERSONNEL DOORS AND ONE NO. ROLLER SHUTTER DOOR ON THE NORTH WESTERN ELEVATION OF THEIR EXISTING INDUSTRIAL FACILITY ALL LOCATED AT THEIR FACILITY

CLASH INDUSTRIAL ESTATE , TRALEE , CO KERRY

239m
17552CONDITIONAL12 Jun 2017

MATERIAL CHANGE OF USE FROM "WEAVING PLANT FOR CLOTH" TO PROCESSING OF SEAWEED AND PRODUCTION OF SEAWEED EXTRACTS

CLASH EAST , CLASH INDUSTRIAL ESTATE , TRALEE

240m
2336CONDITIONAL20 Jan 2023

CHANGE OF USE OF PART OF THE EXISTING INDUSTRIAL BUILDING (CIRCA 9,000M2) FROM A WEAVING PLANT TO A WHISKEY MATURATION STORE AND ALL ANCILLARY SERVICES AND ASSOCIATED SITE WORKS

CLASH INDUSTRIAL ESTATE , TRALEE , CO KERRY

240m
2298N/A3 Feb 2022

CONSTRUCT A RAW MATERIALS INTAKE BUILDING AND ASSOCIATED DRAINAGE LOCATED ON THE SOUTHERN SIDE OF THEIR FACILITY

CLASH INDUSTRIAL ESTATE , TRALEE , CO. KERRY

241m
22309REFUSED21 Mar 2022

CONSTRUCT A GOODS INTAKE BUILDINGAND ASSOCIATED DRAINAGE LOCATED ON THE SOUTHERN SIDE OF THEIR FACILITY

CLASH INDUSTRIAL ESTATE , TRALEE , CO KERRY

242m
22310CONDITIONAL21 Mar 2022

CONSTRUCT (1) NEW ESB SUB STATION WITH ASSOCIATED DRAINAGE ON THE EASTERN SIDE OF EXISTING INDUSTRIAL FACILITY AND (2) PERMISSION FOR A CHANGE OF USE OF PART OF THE INDUSTRIAL BUILDING TO A WAREHOUSE FOR THE MATURATION OF WHISKEY INCLUDING THE CONSTRUCTION OF TWO NEW PERSONNEL DOORS AND ONE ROLLER SHUTTER DOOR ON THE NORTH WESTERN ELEVATION OF THE BUILDING

CLASH EAST , TRALEE , CO KERRY

251m
2460551CONDITIONAL14 Aug 2024

Retention Permission to (a) retain rear extension to original warehouse (b) retain alterations and change of use from warehouse to retail unit, offices and store on ground floor for retail use and (c) retain storage area and showroom on first floor (d) Full Planning Permission to build a new storage shed at rear of premises (e) Full Planning permission for new shop front signage to existing front building

Clash Industrial Estate , Tralee , Co.Kerry

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?