2460372
CONDITIONALSligo - Sligo County Council
Proposed Development
remodel and extend the existing bungalow, change of window layout and addition of 14sqm extension to front / west elevation, together with all associated site works and services
View the full application file on the council's planning portal →Application Timeline
Application received
22 Oct 2024
Decision: CONDITIONAL
5 Dec 2024
Decision due
16 Dec 2024
Grant issued
16 Jan 2025
Application Details
- Location
- No.5 The Borough Road , Ballinphull , Cliffoney Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.06 ha
- Floor Area
- 13.75 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 22 October 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 December 2024
- Grant Date
- 16 January 2025
- Permission Expires
- 15 January 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(refers PL24/60372) for change of use of existing dwelling house for short stay tourism related guest accommodation. Retention of as-built internal layout, revised fenestration, modified car parking driveway and wheelchair access ramp to front elevation, together with all associated site landscaping
No.5 The Borough Road , Ballinphull , Cliffoney
development consisting of the following: to create new ground floor hall window and increase size of first floor hall window to domestic dwelling
3 The Borough Road Ballinphull Cliffoney Co. Sligo F91 F802 ,
Development consisting of extension to north east elevation of existing garage and change of use of full building to separate residential unit to be used for short term holiday letting
Mullaghmore Road , Ballinphull , Cliffoney
Permission ( refers PL 2560189) to (i) seek approval/address condition 2 which required the removal of windows on the west elevation of the stair well (ii) seek a minor non-material amendment for the installation of two windows and the roof light.
The Borough Road , Ballinphull , Cliffoney
construct a new dwelling house and domestic garage, together with all associated site works, required connections to utility services, site landscaping and boundary treatments
The Borough Road , Ballinphull , Cliffoney
The construction of a new two-storey, three bedroom, dormer bungalow dwelling house with pitched roof and a domestic garage, driveway, automated vehicular access gates, and all associated drainage, landscaping, and ancillary works.
The Borough Road , Ballinphull , Cliffoney Co. Sligo
1. Change of use of existing garda station to men’s shed clubhouse 2. new first floor extension over existing station to provide community multi user space. 3. new extension to south west elevation of existing station consisting of single reading room area and two storey section with new stairs and toilets all to the existing garda station
Chapel Rd Ballinphull , Cliffoney , Co. Sligo
retention of revised site boundaries to existing dwelling
Ballinphull , Cliffoney , Co. Sligo
retention of extension as re-constructed to south east elevation and alterations to porch on north west elevation all to existing dwelling
Cartronkillerdoo , Cliffoney , Co.Sligo.
Replacement of existing sunroom extension with new single storey flat roof extension to south east elevation of existing dwelling
No.1 The Willows , Ballinphull Cliffoney , Co. Sligo.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?