2460405
CONDITIONALRoscommon - Roscommon County Council
Proposed Development
Permission to construct a dwelling house, domestic garage, entrance by boundary wall and install an on-site wastewater treatment & disposal system at
View the full application file on the council's planning portal →Application Timeline
Application received
26 Aug 2024
Further information requested
18 Oct 2024
Further information received
5 Feb 2025
Decision due
4 Mar 2025
Decision: CONDITIONAL
4 Mar 2025
Grant issued
7 Apr 2025
Application Details
- Location
- Ballymore East or Corbally Td. , Boyle , Co. Roscommon.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Roscommon County Council
- Site Area
- 0.358 ha
- Floor Area
- 165.64 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 26 August 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 March 2025
- Grant Date
- 7 April 2025
- Permission Expires
- 6 April 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to construct a single storey dwelling, domestic garage, waste water treatment system & percolation area, associated site development works and services at
Ballymore East or Corbally , Boyle , Co. Roscommon.
Permission to construct single storey dwelling, domestic garage, waste water treatment system and percolation area, associated site development works and services at
Ballymore East or Corbally , Boyle , Co. Roscommon.
Permission for the following 1) The construction of a calf shed (385.1 sq.mtrs.) together with associated effluent storage tank (18 cub.mtrs. approx.) and 2) construction of a ‘lean-to’ open shed (148.7 sq.mtrs.). All of the above together with ancillary site works and services, adjacent and ancillary to existing farm complex at
Ballymore West Td. , Boyle , Co. Roscommon.
for the following (1) Permission to retain an agricultural entrance onto a public road and all associated site works. (2) Permission for the construction of an agricultural shed including underground slurry storage tank and construction of a silage slab, along with all associated site works at
Ballymore West Td , Boyle , Co. Roscommon
Permission to Construct Agricultural Shed containing Cubicles and underground slatted tank, together with all associated site works at
Ballymore West Td. , Boyle , Co. Roscommon
to construct slatted shed to contain lieback area and manure pit together with associated site works at
Lisserdrea Td. , Boyle , Co. Roscommon
construction of a new slatted shed including dry bed area and all associated site works
Killaraght , Boyle , County Sligo
to construct new 1) Silage Base, 2)Cattle Handling Facility together with associated meal bin and permission to retain existing Slatted Shed together with all associated site works at
Lisserdrea , Boyle , Co. Roscommon.
Permission for development consisting of the construction of 2 no. wind turbines (turbine tip height of 150m, rotor diameter of 138m) with associated foundations and crane hardstand areas and all associated development including 1 no. substation control building, 1 no. permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between turbines within the wind farm site, 3.75km of overground electric cabling system and 1.53km of underground electric cabling system between the wind farm site and connection point at existing 38 kV ESBN substation in Boyle, 1 no. new site access/entrance off the L-1248 local road at the western boundary to facilitate construction and access, 1 no. temporary construction site compound (750m2), 4 no. peat / spoil deposition areas for storage of excess excavated peat materials, associated surface water management system, tree felling to facilitate site development, temporary works on sections of the public road network along the turbine delivery route (including hedge or tree cutting, relocation of powerlines / poles, lampposts, signage and local road widening) and all associated site works (an NIS and an EIAR have been submitted in respect of the application) at
The Townlands of Leam Ballybaun , Harepark Ardcorcoran Grange Beg , Knockadoobrusna Ballytrasna
permission for development which will consist of the construction of 2 no. wind turbines (maximum turbine tip height 160m) with associated foundations and crane hardstand area and all associated development including 1 No. substation control building, 1 No. permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between turbines within the wind farm site, 3.75km of overground electric cabling system and 1.53km of underground electric cabling system between the wind farm site and connection point at existing 38 kV ESBN substation in Boyle, 1 No. new site access/entrance off the L-1248 local road at the western boundary to facilitate construction and access, 1 No. temporary construction site compound (750m2, 4 No. peat / spoil deposition areas for storage of excess excavated peat materials, associated surface water management system, tree felling to facilitate site development, temporary works on sections of the public road network along the turbine delivery route (including hedge or tree cutting, relocation of powerlines / poles, lampposts, signage and local road widening) and all associated site works( a Natura Impact Statement and Environmental Impact Assessment Report has been prepared in respect of the application) at
Leam Ballybaun Harepark Ardoorooran Carrownageeragh , Grange Beg Knockadoobrusna Ballytrasna , Cashelfinoge and Greatmeadow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?