2460435

N/A

Sligo - Sligo County Council

Proposed Development

(1) permission to retain and complete renovations and alterations to premises including partially constructed stairwell and lift core to the east elevation of the building (2) permission for change of use from former hotel premises to public bar, lounge, pool room, store, office and ancillary accommodation at ground floor, 12 no. self-catering apartments at first and second floor (3) permission for alterations and amendments to existing ground floor to include 1 no. self-catering apartment (4) permission to construct a pumping station to connect with the existing public foul sewer and including all other ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Nov 2024

  2. Further information requested

    22 Jan 2025

  3. Application withdrawn

    10 Nov 2025

Application Details

Location
Seafield Lodge Killeenduff Td. , Easkey , Co. Sligo
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
0.255 ha

Timeline

Registration Date
25 November 2024
Status
WITHDRAWN
Decision
N/A
Withdrawn
10 November 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460364N/A16 Oct 2024

The development will consist of 1) permission to retain and complete a partially constructed stairwell and lift core to the east elevation of the building 2) permission for alterations and amendments to existing ground floor to include 1 no. self-catering apartment 3) permission to construct a pumping station to connect with the existing public foul sewer and including all other ancillary site works and services.

Seafield Lodge Killeenduff Td. , Easkey , Co. Sligo

137m
20124CONDITIONAL24 Apr 2020

Development consisting of the following: 1. the demolition of the existing rear extension and existing shed, 2. proposed extension to the rear and side of the existing dwelling, 3. changes to all elevations and fenestration.

Aderavoher , Easkey , Co Sligo

137m
19168N/A30 Apr 2019

for development consisting of 1. The demolition of the existing rear extension and existing shed. 2. Proposed extension to the rear and side of the existing dwelling. 3. Raising the roof of the existing dwelling to accommodate a first floor level 4. Change to all elevations and fenestration

Adervaher , Easkey , Co. Sligo

195m
18306CONDITIONAL27 Jul 2018

for development consisting of the construction of a new agricultural entrance to lands, together with associated site works

Cloonagleavragh , Easkey , Co. Sligo

229m
1731CONDITIONAL6 Feb 2017

development consisting of the demolition of an existing derelict dwelling house and construction of a new dwelling house and domestic garage with septic tank and percolation area

Cloonagleavragh , Easkey , Co. Sligo

432m
22133CONDITIONAL12 Apr 2022

development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and half Glamping Barns (21sqm. Each x 4.1m high), (v) 7no. Glamping Pods (21sqm. Each x 3.1m high), (vi) 2no. 2-person Bell tents (3m Dia, height 2.1m) (vii) 2no. 4-person Bell tents (4m Dia, height 2.5m), (vii) 7no. Pitch tents, (ix) Proposed landscaping works to the site to extend existing access road from R297, (x) Proposed car park, (xi) Proposed 5m wide planting for screening and privacy to the east of the site, (xii) Connection to all existing services and carry out all ancillary site works

Adervoher Td , Easkey East ED , Co. Sligo

432m
21283N/A21 Jul 2021

Development of lands consisting of .8853 hectares as 'Easkey Glamping Village' to consist of the following elements: Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room and bathrooms. (Total area of 223.60m2); Communal area with Firepit, BBQ, outdoor seating and play area; 3 no. storey and half Glamping Barns (21sqm. each X 4.1 high); 7 no. Glamping Pods (21sqm. each X 3.1 high); 2 no. 2-person Bell tents (3m Dia, height 2.1m); 2 no. 4-person Bell tents (4m Dia, height 2.5m); Pitch tent area; Proposed landscaping works to the site; to extend existing access road from R297; 12 no. car parking spaces for use by the Glamping Site users; proposed planting for screening and privacy to the east of the site; connection to all existing services and carrying out of all ancillary site works

Adervoher Td , Easkey East ED , Co Sligo

437m
21208CONDITIONAL2 Jun 2021

development consisting of the construction of a storage shed together with all associated site works

Killeenduff , Easkey , Co. Sligo

522m
2460106N/A9 Apr 2024

Planning permission for (1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works at Aderavoher, Easkey, Co.Sligo.

Aderavoher , Easkey , Co. Sligo

523m
2460114REFUSED18 Apr 2024

(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works

Aderavoher , Easkey , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?