2460526
CONDITIONALClare - Clare County Council
Proposed Development
for material change of use and alterations of existing public house and dwelling into two townhouses including all ancillary works at existing site
View the full application file on the council's planning portal →Application Timeline
Application received
24 Oct 2024
Decision: CONDITIONAL
4 Dec 2024
Decision due
18 Dec 2024
Grant issued
16 Jan 2025
Application Details
- Location
- The Square , Kildysart , Co. Clare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Site Area
- 0.036 ha
- Floor Area
- 450.8 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 24 October 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 December 2024
- Grant Date
- 16 January 2025
- Permission Expires
- 15 January 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of three no. cooling units to the rear of the premises along with all associated site works
The Corner Bar The Square , Ennis Road , Kildysart Co. Clare
for the following a) to change the use of 2 No. ground floor commercial units into 2 No. ground floor apartments b) to add a single storey rear extension to each ground floor apartment c) to alter the ground floor front elevations along with associated site works
Main Street , Kildysart , Co. Clare
for change of use to convert part of an existing ground floor commercial unit into a 2-bed apartment, including changes to external doors and windows and to convert the remainder of the commercial unit to a storage area
Ennis Road , Kildysart , Co. Clare
for the subdivision of an existing derelict townhouse into two single townhouses, construction of a first floor apartment, archway & access to rear parking, development of parking spaces along with all associated site works
Main Street , Kildysart , Co. Clare.
for the provision of an external ATM to an existing Credit Union Building, including modifications to front elevation to Main Street, Kildysart, along with all associated site works
Main Street , Kildysart , Co. Clare
to convert the former shop and residence at the above address into two number townhouses. The proposed development will consist of internal modifications to the existing building including closing up internal access between the two areas as well as the formation of a new front entrance
Mulhern's , Main Street , Kildysert
to construct an additional afterschool room along with all associated works
Kildysart , Co Clare
of the following changes to the existing dwelling house; a) alterations to front elevation, b) construction of rear conservatory and c) other elevational alterations
3 Kilrush Road , Kildysart , Co Clare
the development works on a 1.79ha /4.43 acre at St John of Bosco Community College, Quay Road, Cahercon, Kildysart, Co Clare V95 TXF1. The development will consist of planning permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound. (vii) a Construction, Environmental Management Plan (CEMP) is provided in support of this application, (viii) take note that following a requirement of the Planning Authority a Natura Impact Statement (NIS) will be submitted to the planning authority with the application,
St. John Bosco Community College , Quay Road , Kildysart Co Clare V95 TXF1
for development which will consist of planning Permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound.
St. John Bosco Community College , Quay Road , Kildysart Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?