2460545
N/ADonegal - Donegal County Council
Proposed Development
DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK, & WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING; AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. THE PLANNING APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS).
View the full application file on the council's planning portal →Application Details
- Location
- LAND AT NORTH WESTERN CORNER OF MAIN STREET , BETWEEN MAIN STREET AND JOHNSTON STREAM , ST JOHNSTON
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.222 ha
Timeline
- Registration Date
- 18 April 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
DEVELOPMENT OF A NEW SEWERAGE PUMPING STATION, RISING MAIN AND GRAVITY SEWER CONSISTING OF: (A) TYPICAL UNDERGROUND STORAGE CHAMBER/TANK, (B) ABOVE GROUND CONTROL KIOSK, MOTOR CONTROL CENTRE (MCC) KIOSK AND WASH WATER KIOSK, (C) TELEMETRY POLE (MAXIMUM 6M IN HEIGHT), (D) PERIMETER PALADIN FENCING (2.4M IN HEIGHT), (E) ACCESS ROAD (4M WIDE) AND INTERNAL VEHICULAR TURNING AREA, (F) WET WELL CHAMBER (27M³), (G) PASSIVE ACTIVATED CARBON FILTERS OVER THE WET WELL CHAMBER FOR VENTILATION, (H) RISING MAIN (APPROXIMATELY 160M IN LENGTH), (I) INLET SEWER, (J) EMERGENCY STORAGE AND OVERFLOW, INCLUDING A NEW HEADWALL AT ST. JOHNSTON STREAM, (K) INLET, WET WELL, VALVE CHAMBERS, AND METER CHAMBER, (L) LIGHTING AND WELFARE FACILITIES. THE PROPOSED DEVELOPMENT WILL SPAN AN AREA OF APPROXIMATELY 2216M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
WESTERN CORNER OF MAIN STREET , ST JOHNSTON , CO. DONEGAL
CONSTRUCTION OF 2 COMMERCIAL BUILDINGS, ONE BUILDING TO THE FRONT OF THE SITE CONSISTING OF 2 RETAIL PREMISES AND ONE SELF CONTAINED APARTMENT, THE 2ND BUILDING IS TO THE REAR TO THE SITE CONSISTING OF 4 NO. OF SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES ON SITE
MAIN STREET , ST. JOHNSTON , LIFFORD PO
CONSTRUCTION OF A COMMERCIAL UNIT CONSISTING OF 2 NO. RETAIL UNITS AND 5 NO. SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES
MAIN STREET , ST. JOHNSTON , LIFFORD PO
CONSTRUCTION OF ONE COMMERCIAL BUILDING, AND ONE RESIDENTIAL BUILDING, THE COMMERCIAL BUILDING IS TO THE FRONT OF THE SITE CONSISTING OF 2 RETAIL PREMISES AND ONE SELF CONTAINED APARTMENT, THE SECOND BUILDING IS A RESIDENTIAL BUILDING TO THE REAR OF SITE CONSISTING OF 4 SELF CONTAINED APARTMENTS AND ALL ANCILLARY WORKS WITH CONNECTION TO ALL EXISTING SERVICES
MAIN STREET , ST JOHNSTON , LIFFORD PO
DEVELOPMENT OF A PREFABRICATED BUILDING CONTAINING OFFICE SPACE AS ANCILLARY ACCOMMODATION TO RESOURCE CENTRE AND ASSOCIATED SITE DEVELOPMENT AND DRAINAGE WORKS
ST. JOHNSTON , LIFFORD PO , CO. DONEGAL
CONSTRUCTION OF ASTRO TURF PITCH WITH PERIMETER FENCING AND FLOODLIGHTING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ST. JOHNSTON , LIFFORD PO , CO. DONEGAL
ERECTION OF A SINGLE STOREY EXTENSION TO THE EXISTING SCHOOL COMPRISING TWO CLASSROOMS AND ASSOCIATED ACCOMMODATION FOR SPECIAL NEEDS STUDENTS AND ASSOCIATED EXTERNAL WORKS
ST BAITHINS NATIONAL SCHOOL , ST JOHNSTON , LIFFORD PO
DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR DECOMMISSIONING OF THE SEPTIC TANK SYSTEM AND CONNECTION TO THE MAINS SEWER DRAINAGE TOGETHER WITH ALL ASSOCIATED SITE WORKS
ST JOHNSTON , LIFFORD PO , CO DONEGAL
EXTENSION AND MINOR AMENDMENT TO FRONT OF PREMISES AND PERMISSION FOR CHANGE OF USE OF PREMISES TO A 1 BEDROOM APARTMENT AND 2 NO. SHOP UNITS ALONG WITH ALL ASSOCIATED SITE WORKS
ST. JOHNSTON , LIFFORD PO , CO. DONEGAL
CONSTRUCTION OF A SMALL EXTENSION TO THE REAR OF EXISTING GALA SHOP ALONG WITH ALL ASSOCIATED WORKS
ST. JOHNSTON , LIFFORD PO , CO. DONEGAL
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?