Proposed Development
the alteration of the existing building, which will include the following works: amended position of the existing vehicular and pedestrian entrance at Donogh O’Malley Park, new vehicular and pedestrian entrance at Churchfield, Donogh O’Malley Park. Permission for external signage, the alteration of existing façades and roof areas, the erection of external fixed canopy areas, a new car-parking area with 35 no. car spaces, including 8 no. disabled access spaces, new ancillary site structures to include a bicycle parking shelter, refuse store and services building, site landscaping, boundary treatments and ancillary site works including amendments to widen and extend pedestrian footpaths adjacent to the site
View the full application file on the council's planning portal →Application Details
- Location
- Southill Junior School , Donogh O'Malley Park , Southill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 0.925 ha
Timeline
- Registration Date
- 7 June 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the alteration of the existing building and will include the following works: i. Amended position of the existing vehicular & pedestrian entrance at Donogh O’Malley Park ii. Widening of existing road access at Donogh O’Malley Park including alteration of footpath and public lighting iii. External signage iv. Alteration of existing façades & roof areas v. Erection of external fixed canopy areas vi. New car-parking area with 35 no. car spaces, including 8 no. disabled access spaces. vii. New ancillary site structures to include a bicycle parking shelter, refuse store & services building viii. Site landscaping, boundary treatments and ancillary site works including amendments to widen & extend pedestrian footpaths adjacent to the site
Southill Junior School , Donogh O'Malley Park , Southill Limerick
the construction of a new play area including all necessary site works, associated boundary treatment and provision of drainage and lighting. The works will include preparation of the site, installation of a range of play equipment, a protective perimeter, safety surfacing, tree and shrub planting, site furniture and the construction of a new uncontrolled pedestrian crossing
Castle Oaks View , Southill , Limerick
(i) provision of 27 no. residential units comprising 4no. 1 bed, 14 no. 2 beds & 9no. 3 bed units; (ii) modification to the existing road network, (iii) relocation of an existing ESB substation & (iv) all associated site works
Palm Court , Keyes Park , Southill Limerick
the phased alterations and change of use of Bay 1, some 2200 sq.m from Youth Resource/Social & Recreation Centre to warehousing. The works will include the following: Phase 1: Removal of the existing subdivision of Bays 2, 3, 4 & 5 of the former Fulflex Building to enable the current 4 units to be returned to their former combined arrangement. Erection of a covered conveyor line between VPK Packaging Ltd production building to the former Fulflex Building. Phase 2: Demolition of existing administration building along the front elevation of the former Fulflex Building to facilitate the increase of vehicular parking facilities to accommodate lorry parking bays and associated turning circle with associated site works. Removal of existing subdivisions between Bay 1 and adjoining bays to return existing arrangement to former combined format and a change in use from Youth Services Facility to warehousing. Phase 3: Demolition of existing single storey annex buildings along the eastern elevation of the VPK Packaging Ltd buildings and erection of a single storey industrial building extension in its place to accommodate replacement production equipment and associated site works including storm water attenuation tanks
Galvone Business Park , Galvone , Limerick
alterations to existing car entrance and pedestrian entrance and propose to construct a new exit for cars only, and associated site works
VPK Packaging Ltd , Galvone Industrial Estate , Galvone Road Limerick.
1. Side extension to existing corrugator building 2. Front extension to existing corrugator building including removal of existing front lean to roof and include this floor area under new portal 'A' frame and all associated site works
Galvone Business Park , Galvone , Limerick
the construction of a car park and yard extension, construction of a new boundary walls and fencing, alterations to existing entrance and gate, alterations to existing external cladding, erection of new signage, construction of truck loading dock and canopy and all ancillary site works
Galvone Industrial Estate , Galvone , Limerick.
the construction of a standalone office building, re-establishment of an existing entrance off the main Galvone Industrial Estate road to provide access for the public to the southside of the site, an air exchange unit, a new fire escape door to the east elevation of the existing building, an empty skip storage area, an increased capacity to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company, and all associated site works
Unit 10b , Galvone Industrial Estate , Co. Limerick.
the continued retention of the capacity granted under P18/1278 i.e. to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company along with all associated works
Unit 10b , Galvone Industrial Estate , Limerick.
removal of existing rear boundary wall and the construction of a new rear and side boundary wall and the construction of a two storey warehouse which contains 3 number warehouse units with offices at first floor level, site entrance and all associated site works
Unit 4 , Galvone Business Park , Galvone Limerick.
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?