← Back to search

Garryntemple , Grange Clonmel , Co. Tipperary

N/A

Planning application 2460601

Tipperary - Tipperary County Council

Proposed Development

construction of an above ground effluent storage tank together with all relevant ancillary site works and associated site works

View the full application file on the council's planning portal →

Application Details

Location
Garryntemple , Grange Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
3.62 ha

Timeline

Registration Date
25 July 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
2460669N/A14 Aug 2024

the construction of an above ground effluent storage tank together with all relevant ancillary and associated site works

Garryntemple , Grange Clonmel , Co.Tipperary

16m
2460764CONDITIONAL12 Sept 2024

the construction of an above ground effluent storage tank together with all relevant ancillary site works and associated site works

Garryntemple , Grange Clonmel , Co.Tipperary

793m
2561203CONDITIONAL21 Nov 2025

continuation of planning permission granted under reference no. 15600402 for a readymix facility and the acceptance of construction and demolition waste for the purpose of recovery and reuse by crushing on site, and ancillary equipment including existing plant, portacabin and containers. Also RETENTION PERMISSION is sought for two storage units

Carrickconeen , Grange , Clonmel Co. Tipperary

802m
2561003N/A7 Oct 2025

the continuation of permission granted under planning permission ref 15600402 for a readymix facility and the acceptance of construction and demolition waste for the purpose of recovery and reuse by crushing on site, and ancillary equipment. RETENTION PERMISSION is also sought for two storage units

Carrickconeen , Grange , Clonmel

902m
20630N/A19 Jun 2020

construction of an extension to existing abattoir building for (i) new Hide store (ii) New refrigeration store (iii) hide/offal yard (iv) walled concrete yard (v) underground effluent tank (vi) cover crush and holing yard (vii) Entrance hall with Hygiene lobby and all associated site works

Garryntemple , Clonmel , Co. Tipperary

906m
20671N/A29 Jun 2020

construction of an extension to existing abattoir building for (i) new Hide store (ii) New refrigeration store (iii) hide/offal yard (iv) walled concrete yard (v) underground effluent tank (vi) cover crush and holing yard (vii) Entrance hall with Hygiene lobby and all associated site works

Garryntemple , Clonmel , Co. Tipperary

907m
20731CONDITIONAL9 Jul 2020

construction of an extension to existing abattoir building for (i) new Hide store (ii) New refrigeration store (iii) hide/offal yard (iv) walled concrete yard (v) underground effluent tank (vi) cover crush and holding yard (vii) Entrance hall with Hygiene lobby and all associated site works

Garryntemple , Clonmel , Co. Tipperary

908m
19600240CONDITIONAL15 Mar 2019

construction of an extension to existing abattoir building for (i) new Hide store (ii) New refrigeration store (iii) hide/offal yard (iv) walled concrete yard (v) underground effluent tank and all associated site works

Garryntemple , Clonmel , Co. Tipperary

910m
18600355N/A22 Mar 2018

construct a (i) beef shed incorporating straw lie back areas, crush area with underground effluent tanks (ii) walled silage slab (iii) walled manure pit (iv) meal bins (v) concrete yards and all associated site works. Retention of covered feeding area is also required

Garryntemple , Clonmel , Co. Tipperary

937m
18600380CONDITIONAL28 Mar 2018

to construct a (i) Beef shed incorporating straw lie back areas, crush area with underground effluent tanks (ii) Walled Silage slab (iii) Walled manure pit (iv) Meal bins (v) concrete yards and all associated site works. Retention of covered feeding area is also required

Garryntemple , Clonmel , Co Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?