2460603
CONDITIONALLimerick - Limerick County Council
Proposed Development
the demolition of an existing farm shed; the construction of a single storey dwelling house and vehicular entrance, garage, domestic waste water treatment system and polishing filter, together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
17 Jun 2024
Decision: CONDITIONAL
8 Aug 2024
Decision due
11 Aug 2024
Grant issued
11 Sept 2024
Application Details
- Location
- Ballyea , Fedamore , Co. Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 0.31 ha
- Floor Area
- 167 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 June 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 August 2024
- Grant Date
- 11 September 2024
- Permission Expires
- 10 September 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
an all-weather pitch with 12 metre high floodlighting and the construction of a precast hurling wall. Permission is also sought for the erection of lighting around the existing walking track
Fedamore GAA Grounds , Boolavoord , Fedamore Co. Limerick
construction of extension to side of existing property at ground & first floor levels and all associated works
11 Cluain Ard , Fedamore , Co. Limerick
a two storey side extension and to convert existing attic space into a habitable room, new dormer window to rear elevation and all associated site works
9 Cluain Ard , Fedamore , Co. Limerick.
the construction of a single storey side extension and Planning Permission for a front boundary wall, site entrance and all associated site works
Ballyea , Fedamore , Co. Limerick.
the construction of a single storey side extension and Planning Permission for a front boundary wall, site entrance and all associated site works
Ballyea , Fedamore , Co. Limerick.
the construction of a single storey side extension and Planning Permission for a front boundary wall, site entrance and all associated site works
Ballyea , Fedamore , Co. Limerick.
the installation of a mobile home (3.68m x 10.69m) on site for a period of 12 months for residential use only by his family while his dwelling is being made habitable and all associated site works
Ballyhea , Fedamore , Co. Limerick
a) retention of ground floor slab level to detached house (number 39) and permission for completion of detached dwelling unit, b) retention of and permission for completion of as constructed semi-detached houses (numbers 40 & 41); and c) all associated site development works
39-41 Cluain Ard , Fedamore , Co Limerick
Extension of Duration for Planning Ref. 20/1121: construction of a dwelling house, detached garage, foul connection to public main services, site entrance and all associated site works
Castlequarter , Fedamore , Co. Limerick
construction of a dwelling house, detached garage, foul connection to public main services, site entrance and all associated site works
Castlequarter , Fedamore , Co. Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?