Tipperary - Tipperary County Council

Proposed Development

a new wastewater treatment system with over ground tankage up to 6.5m high with ancillary works such as drainage, roads, fencing and landscaping at the existing facility

View the full application file on the council's planning portal →

Application Details

Location
Technopath Life Sciences Park , Fort Henry , Ballina Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.145 ha

Timeline

Registration Date
26 July 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
2460547N/A5 Jul 2024

a new wastewater treatment system with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility

Technopath Life Sciences Park , Fort Henry , Ballina Co. Tipperary

16m
17600992N/A8 Sept 2017

the construction of a light industrial workshop unit, connection to existing services on site and all ancillary site works

Fort Henry Business Park , Garrynatineel , Ballina

25m
2660423N/A11 May 2026

construction of a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application

Fort Henry Business Park , Ballina , Co Tipperary

51m
2660446CONDITIONAL15 May 2026

a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application.

Fort Henry Business Park , Ballina , Co Tipperary

82m
2460970N/A12 Nov 2024

a single storey extension to the northern end of the Production/Administration Building, new single storey link corridor between Production/Administration Building and Warehouse, new single storey extension accessed from new link corridor, relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor, new first floor windows to north elevation of Production/Administration Building, all associated ancillary site works and PERMISSION for RETENTION of existing single storey refrigeration building with new connection to new corridor, 2 nr. existing containerised refrigeration units to the south-west of unit 2 - A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application

Fort Henry Business Park , Ballina , Co. Tipperary

82m
2461048N/A6 Dec 2024

decommissioning the existing wastewater treatment system and constructing a new wastewater treatment system with overground tankage up to 6.5m high with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application.

Technopath Life Sciences Park , Fort Henry , Ballina Co. Tipperary

108m
2014N/A10 Jan 2020

3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works.

Fort Henry , Business Park , Garrynatineel Ballina

116m
19601454N/A20 Dec 2019

3 temporary refrigeration units, air handling units, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L, and alterations and omissions to previously approved Planning reference 13510354. The alterations include internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works. The omissions include omitting the approved extensions to units 3A - 3G2 and to the east of units 3J, I and H, including part of the extension to the west of units 3J, I and H and the covered walkway

Fort Henry Business Park , Garrynatineel , Ballina Co. Tipperary

126m
2023CONDITIONAL16 Jan 2020

3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works.

Fort Henry , Business Park , Garrynatineel Ballina

146m
2460893N/A17 Oct 2024

- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application

Technopath Manufacturing Ltd , Fort Henry Business Park , Ballina

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?