The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460661

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

the construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Aug 2024

  2. Further information requested

    2 Oct 2024

  3. Further information received

    20 Nov 2024

  4. Decision: CONDITIONAL

    12 Dec 2024

  5. Decision due

    17 Dec 2024

  6. Grant issued

    24 Jan 2025

Application Details

Location
Ballyboe , Ballypatrick , Co.Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.665 ha
Floor Area
248.19 sq m
Residential Units
1

Timeline

Registration Date
10 August 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 December 2024
Grant Date
24 January 2025
Permission Expires
23 January 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

415m
19600239CONDITIONAL15 Mar 2019

a 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW compositing of photovoltaic panels on ground mounted frames with associated infrastructure including 4 No. Inverter Housing cabins, 1 No. control building, 1 No. customer cabin (substation), 1 No. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. The planning application will be accompanied by a Natura Impact Statement

Ballyboe , Clonmel , Co. Tipperary

415m
21403CONDITIONAL29 Mar 2021

amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW

Ballyboe , Clonmel , Co. Tipperary

507m
2660072N/A29 Jan 2026

a RED III development for a period of 10 years for the construction of a solar PV energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of PV panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, new on-site ESB 38kV substation building, 33kV control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The Application Site will be accessed from two new access points off the R706, one of which was previously consented under Planning Reference: 19600239. The Proposed Development will connect with and represents an extension to the adjacent solar farm permitted under Planning Reference 19600239 and 21403. Permission is also sought for minor amendments to Planning Reference 19600239 and 21403 which comprises of (1) Minor adjustments to the perimeter fencing (length decreasing by c.1km), (2) Minor adjustments to the red line boundary (decreasing by c.1km), (3) Increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kV substation and will have an operational lifetime of 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Within the townland of , Ballyboe , County Tipperary

809m
18600229CONDITIONAL23 Feb 2018

the following development: construct an extension to the side of existing dwelling, including all associated site development works to facilitate the proposed development

Ballyglasheen , Kilsheelan , Co. Tipperary

827m
211424CONDITIONAL24 Sept 2021

demolition of an existing two storey dwelling and for the construction of a single storey replacement dwelling with associated effluent treatment plant and percolation area. And all associated site development works including alterations to existing site entrance and associated roadside boundary set-back.

Ballyknockane & Ballyboe , Ballypatrick , Clonmel

858m
2560732CONDITIONAL28 Jul 2025

the as-constructed roadway and access onto the local road (L2504) and PERMISSION for construction of a fence and gate

Ballyboe , Ballypatrick Clonmel , Co. Tipperary

899m
2460634CONDITIONAL5 Aug 2024

the construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and All necessary associated site works and services

Cooloran , Ballypatrick , Clonmel Co. Tipperary

1.0km
18601154N/A21 Sept 2018

construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services

Ballyboe , Ballypatrick , Clonmel

1.0km
2260070CONDITIONAL17 Feb 2022

the following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works

Killurney , Ballypatrick , Clonmel

1.1km
18601257CONDITIONAL18 Oct 2018

construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services

Ballyboe , Ballypatrick , Clonmel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?