The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460668

CONDITIONAL

Clare - Clare County Council

Proposed Development

the development works on a 1.79ha /4.43 acre at St John of Bosco Community College, Quay Road, Cahercon, Kildysart, Co Clare V95 TXF1. The development will consist of planning permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound. (vii) a Construction, Environmental Management Plan (CEMP) is provided in support of this application, (viii) take note that following a requirement of the Planning Authority a Natura Impact Statement (NIS) will be submitted to the planning authority with the application,

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Dec 2024

  2. Decision: CONDITIONAL

    20 Feb 2025

  3. Decision due

    22 Feb 2025

  4. Grant issued

    1 Apr 2025

Application Details

Location
St. John Bosco Community College , Quay Road , Kildysart Co Clare V95 TXF1
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
1.79 ha

Timeline

Registration Date
20 December 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 February 2025
Grant Date
1 April 2025
Permission Expires
31 March 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360248N/A12 Jul 2023

for development which will consist of planning Permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound.

St. John Bosco Community College , Quay Road , Kildysart Co. Clare

2m
2460621N/A7 Dec 2024

The development will consist of planning Permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound. (vii) a Construction, Environmental Management Plan (CEMP) is provided in support of this application, (viii) take note that following a requirement of the Planning Authority a Natura Impact Statement (NIS) is provided in support of this application

St. John Bosco Community College , Quay Road , Kildysart Co Clare V95 TXF1

171m
22476CONDITIONAL27 May 2022

to construct an additional afterschool room along with all associated works

Kildysart , Co Clare

197m
2560330CONDITIONAL5 Jun 2025

to construct a new dwelling house, new entrance, private garage, to provide connections to sewerage and water facilities along with all associated works

Quay Road , Kildysart , Co. Clare

207m
2516CONDITIONAL21 Jan 2025

for the following a) to change the use of 2 No. ground floor commercial units into 2 No. ground floor apartments b) to add a single storey rear extension to each ground floor apartment c) to alter the ground floor front elevations along with associated site works

Main Street , Kildysart , Co. Clare

214m
2460526CONDITIONAL24 Oct 2024

for material change of use and alterations of existing public house and dwelling into two townhouses including all ancillary works at existing site

The Square , Kildysart , Co. Clare.

214m
2360153CONDITIONAL16 May 2023

of three no. cooling units to the rear of the premises along with all associated site works

The Corner Bar The Square , Ennis Road , Kildysart Co. Clare

241m
2660103N/A25 Feb 2026

for the construction of a new dwelling house and garage complete with a wastewater treatment system and ancillary works

Quay Road , Kildysart , Co. Clare

241m
19387CONDITIONAL16 May 2019

for change of use to convert part of an existing ground floor commercial unit into a 2-bed apartment, including changes to external doors and windows and to convert the remainder of the commercial unit to a storage area

Ennis Road , Kildysart , Co. Clare

252m
23565CONDITIONAL10 Nov 2023

to convert the former shop and residence at the above address into two number townhouses. The proposed development will consist of internal modifications to the existing building including closing up internal access between the two areas as well as the formation of a new front entrance

Mulhern's , Main Street , Kildysert

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?