The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460773

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 May 2024

  2. Further information requested

    11 Jul 2024

  3. Further information received

    25 Jul 2024

  4. Decision: CONDITIONAL

    15 Aug 2024

  5. Decision due

    21 Aug 2024

  6. Grant issued

    18 Sept 2024

Application Details

Location
COMMON , RAPHOE , LIFFORD
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.3 ha
Floor Area
207 sq m
Residential Units
1

Timeline

Registration Date
27 May 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 August 2024
Grant Date
18 September 2024
Permission Expires
17 September 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

302m
2152004CONDITIONAL11 Oct 2021

CONSTRUCTION OF A NEW AGRICULTURAL SHED MEASURING 140SQM TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

COMMON , RAPHOE , LIFFORD PO

531m
2562081CONDITIONAL27 Nov 2025

CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPOSED SEPTIC TANK AND PERCOLATION AREA

CRAIGS , RAPHOE , LIFFORD PO

752m
1751387CONDITIONAL13 Sept 2017

CONSTRUCTION OF A NEW DWELLING HOUSE WITH A DOMESTIC GARAGE TOGETHER WITH AN ONSITE SEPTIC TANK & PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

COMMON , RAPHOE , LIFFORD P.O.

758m
2250087CONDITIONAL27 Jan 2022

EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (PREVIOUSLY GRANTED PERMISSION UNDER PL. REF. 12/60069) TOGETHER WITH ANTENNAS, DISHES, CABINETS, FENCING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CRAIGS , RAPHOE , LIFFORD PO

881m
1952015CONDITIONAL20 Dec 2019

(1) QUARRYING OF 4.81 HECTARES WHICH WILL BE SUBJECT TO EXTRACTION AND PROCESSING OF ROCK BY DRILLING, BLASTING, CRUSHING AND SCREENING (2) LANDSCAPING OF THE QUARRY DURING THE OPERATIONAL PHASE AND RESTORATION OF THE QUARRY ON COMPLETION OF EXTRACTION (3) ERECTION OF SITE OFFICE WITH CANTEEN FACILITIES (4) INSTALLATION OF WASTEWATER TREATMENT UNIT & PERCOLATION AREA (5) ALL ASSOCIATED ANCILLARY FACILITIES / WORKS OVER A 25 YEAR PERIOD

MAGHERASOLIS & CRAIGS , RAPHOE , LIFFORD PO

903m
2250836N/A13 May 2022

(1) QUARRYING OF 5.37 HECTARES WHICH WILL BE SUBJECT TO EXTRACTION AND PROCESSING OF ROCK THROUGH DRILLING, BLASTING, CRUSHING AND SCREENING (2) CONSTRUCTION OF (A) SETTLEMENT PONDS AND CONSTRUCTED WETLAND (B) A SHED FOR THE PURPOSES OF STORAGE FOR THE FACILITY INCLUDING THE ON-SITE MACHINERY MAINTENANCE (C) SITE OFFICE WITH CANTEEN, TOILET & DRYING FACILITIES (3) INSTALLATION OF A WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA (4) PROVISION OF A WHEEL WASH AND WEIGHBRIDGE (5) LANDSCAPING OF THE QUARRY DURING THE OPERATIONAL PHASE AND RESTORATION OF THE QUARRY ON COMPLETION OF EXTRACTION (5) ALL ASSOCIATED ANCILLARY FACILITIES / WORKS OVER A 25 YEAR PERIOD. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) & NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

MAGHERASOLIS & CRAIGS , RAPHOE , LIFFORD PO

903m
2250933CONDITIONAL30 May 2022

(1) DEMOLITION OF EXISTING CONCRETE STRUCTURE (2) QUARRYING OF 5.37 HECTARES WHICH WILL BE SUBJECT TO EXTRACTION AND PROCESSING OF ROCK THROUGH DRILLING, BLASTING, CRUSHING AND SCREENING (3) CONSTRUCTION OF (A) SETTLEMENT PONDS AND WETLAND (B) A SHED FOR THE PURPOSES OF STORAGE FOR THE FACILITY INCLUDING ON-SITE MACHINERY MAINTENANCE (C) SITE OFFICE WITH CANTEEN, TOILET & DRYING FACILITIES (4) INSTALLATION OF A WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA (5) PROVISION OF A WHEEL WASH AND WEIGHBRIDGE (6) LANDSCAPING OF THE QUARRY DURING THE OPERATIONAL PHASE AND RESTORATION OF THE QUARRY ON COMPLETION OF EXTRACTION (7) ALL ASSOCIATED ANCILLARY FACILITIES / WORKS OVER A 25 YEAR PERIOD. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) & NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

MAGHERASOLIS & CRAIGS , RAPHOE , LIFFORD PO

1.0km
2150951UNCONDITIONAL19 May 2021

UNAUTHORISED DEVELOPMENT UD20262 CONSISTING OF A MASONRY BOUNDARY WALL AND ALL ASSOCIATED SITE WORKS

NO 2 MONTGORRY CLOSE , TOWNPARKS , RAPHOE

1.0km
2661550N/A20 Aug 2026

CONSTRUCTION OF A SINGLE STOREY EXTENSION TO FRONT OF DWELLING

IRISH ROW , RAPHOE TOWNPARKS , RAPHOE LIFFORD PO

1.1km
2251825CONDITIONAL9 Nov 2022

(1) TEMPORARY RELOCATION OF 4 EXISTING PREFABS FROM EXISTING CAR PARK AREA AT THE EAST OF THE SITE TO THE ALL-WEATHER PITCH AT THE NORTH OF THE SITE, (2) ERECTION OF A NEW STAND-ALONE 2 STOREY MODULAR BUILDING CONTAINING 8 CLASSROOMS, 1 SET ROOM, TOILETS AND ANCILLARY SPACES ON THE SITE OF THESE 4 EXISTING PREFABS, (3) CONNECTION INTO EXISTING SEWERAGE AND DRAINAGE SYSTEMS AND (4) UPGRADING OF THE HARD-STANDING PARKING AREA TO THE NORTH OF THE SPORTS HALL TO REPLACE THE PARKING SPACES LOST WHERE THE PROPOSED MODULAR BUILDING IS TO BE SITED AND PROVIDE ADDITIONAL SPACES TO ACCOMMODATE THE 8 EXTRA CLASSROOMS WITHIN THE MODULAR BUILDING AND ALL ASSOCIATED SITEWORKS

DEELE COLLEGE , MEETING HOUSE STREET , RAPHOE LIFFORD PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?