The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2460796

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

the alteration of the existing building and will include the following works: i. Amended position of the existing vehicular & pedestrian entrance at Donogh O’Malley Park ii. Widening of existing road access at Donogh O’Malley Park including alteration of footpath and public lighting iii. External signage iv. Alteration of existing façades & roof areas v. Erection of external fixed canopy areas vi. New car-parking area with 35 no. car spaces, including 8 no. disabled access spaces. vii. New ancillary site structures to include a bicycle parking shelter, refuse store & services building viii. Site landscaping, boundary treatments and ancillary site works including amendments to widen & extend pedestrian footpaths adjacent to the site

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Aug 2024

  2. Further information requested

    1 Oct 2024

  3. Further information received

    27 Nov 2024

  4. Decision: CONDITIONAL

    19 Dec 2024

  5. Decision due

    2 Jan 2025

  6. Grant issued

    30 Jan 2025

Application Details

Location
Southill Junior School , Donogh O'Malley Park , Southill Limerick
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Site Area
0.925 ha

Timeline

Registration Date
8 August 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 December 2024
Grant Date
30 January 2025
Permission Expires
29 January 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
2460560N/A7 Jun 2024

the alteration of the existing building, which will include the following works: amended position of the existing vehicular and pedestrian entrance at Donogh O’Malley Park, new vehicular and pedestrian entrance at Churchfield, Donogh O’Malley Park. Permission for external signage, the alteration of existing façades and roof areas, the erection of external fixed canopy areas, a new car-parking area with 35 no. car spaces, including 8 no. disabled access spaces, new ancillary site structures to include a bicycle parking shelter, refuse store and services building, site landscaping, boundary treatments and ancillary site works including amendments to widen and extend pedestrian footpaths adjacent to the site

Southill Junior School , Donogh O'Malley Park , Southill

101m
238008N/A26 Jun 2023

the construction of a new play area including all necessary site works, associated boundary treatment and provision of drainage and lighting. The works will include preparation of the site, installation of a range of play equipment, a protective perimeter, safety surfacing, tree and shrub planting, site furniture and the construction of a new uncontrolled pedestrian crossing

Castle Oaks View , Southill , Limerick

181m
178003N/A31 Mar 2017

(i) provision of 27 no. residential units comprising 4no. 1 bed, 14 no. 2 beds & 9no. 3 bed units; (ii) modification to the existing road network, (iii) relocation of an existing ESB substation & (iv) all associated site works

Palm Court , Keyes Park , Southill Limerick

276m
21138CONDITIONAL10 Feb 2021

the phased alterations and change of use of Bay 1, some 2200 sq.m from Youth Resource/Social & Recreation Centre to warehousing. The works will include the following: Phase 1: Removal of the existing subdivision of Bays 2, 3, 4 & 5 of the former Fulflex Building to enable the current 4 units to be returned to their former combined arrangement. Erection of a covered conveyor line between VPK Packaging Ltd production building to the former Fulflex Building. Phase 2: Demolition of existing administration building along the front elevation of the former Fulflex Building to facilitate the increase of vehicular parking facilities to accommodate lorry parking bays and associated turning circle with associated site works. Removal of existing subdivisions between Bay 1 and adjoining bays to return existing arrangement to former combined format and a change in use from Youth Services Facility to warehousing. Phase 3: Demolition of existing single storey annex buildings along the eastern elevation of the VPK Packaging Ltd buildings and erection of a single storey industrial building extension in its place to accommodate replacement production equipment and associated site works including storm water attenuation tanks

Galvone Business Park , Galvone , Limerick

306m
2461252CONDITIONAL16 Dec 2024

alterations to existing car entrance and pedestrian entrance and propose to construct a new exit for cars only, and associated site works

VPK Packaging Ltd , Galvone Industrial Estate , Galvone Road Limerick.

317m
1740CONDITIONAL20 Jan 2017

1. Side extension to existing corrugator building 2. Front extension to existing corrugator building including removal of existing front lean to roof and include this floor area under new portal 'A' frame and all associated site works

Galvone Business Park , Galvone , Limerick

325m
18585CONDITIONAL12 Jun 2018

the construction of a car park and yard extension, construction of a new boundary walls and fencing, alterations to existing entrance and gate, alterations to existing external cladding, erection of new signage, construction of truck loading dock and canopy and all ancillary site works

Galvone Industrial Estate , Galvone , Limerick.

333m
181278CONDITIONAL21 Dec 2018

the construction of a standalone office building, re-establishment of an existing entrance off the main Galvone Industrial Estate road to provide access for the public to the southside of the site, an air exchange unit, a new fire escape door to the east elevation of the existing building, an empty skip storage area, an increased capacity to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company, and all associated site works

Unit 10b , Galvone Industrial Estate , Co. Limerick.

334m
22838CONDITIONAL29 Jul 2022

the continued retention of the capacity granted under P18/1278 i.e. to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company along with all associated works

Unit 10b , Galvone Industrial Estate , Limerick.

344m
26123N/A11 May 2026

removal of existing rear boundary wall and the construction of a new rear and side boundary wall and the construction of a two storey warehouse which contains 3 number warehouse units with offices at first floor level, site entrance and all associated site works

Unit 4 , Galvone Business Park , Galvone Limerick.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?