2460813
CONDITIONALTipperary - Tipperary County Council
Proposed Development
the construction of a dormer extension to the dwelling, including all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
25 Sept 2024
Decision: CONDITIONAL
18 Nov 2024
Decision due
19 Nov 2024
Grant issued
22 Dec 2024
Application Details
- Location
- Rose Cottage , Tullamaine Fethard , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.336 ha
Timeline
- Registration Date
- 25 September 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 18 November 2024
- Grant Date
- 22 December 2024
- Permission Expires
- 21 December 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a new single storey family house, wastewater treatment system, percolation area, site entrance together with all ancillary site works
Tullamaine , Fethard , Co. Tipperary
a dwelling house, garage, driveway, new entrance, treatment system and all associated site development works
Tullamain , Fethard , Co. Tipperary
(1) the construction of a storey and a half extension to dwelling, (2) the renovation of the existing dwelling, (3) the construction of a domestic garage and associated site works
De Barra Farm , Tullamaine , Fethard
the construction of new entrance from public roadway onto forestry lands on the Southern side of the public roadway, to comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, fences, finished hardcored structure to access area and all associated siteworks
Rathsallagh , Rosegreen , Cashel
the indefinite retention of as-constructed 4 box stables building with associated tack room
Tullamain , Fethard , Co. Tipperary
an increased throughput of organic waste material at the existing Miltown composting facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
Miltownmore , Fethard , Co. Tipperary
reconstruction of and extension to existing agricultural storage building and all necessary site works and services
Milltowmore , Fethard , Co Tipperary
Biofilter and associated extract and input fans to compost maturation shed with embankment screen. Roof watering harvesting storage tank.
Milltownmore , Fethard , Co. Tipperary
reconstruction of and extension to existing agricultural storage building and all necessary site works and services
Milltownmore , Fethard , Co. Tipperary
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02)
Milltownmore , Fethard , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?