2460855
CONDITIONALLimerick - Limerick County Council
Proposed Development
the development that will consist of: The demolition of the existing single storey school buildings (area 3,101m²) on site and the construction of an 8,387m² two and four storey 650 pupil post-primary school, including general teaching and administration rooms, a PE hall, a Special Education Needs facility, external stores, ESB substation, 56 No. car parking spaces, 68 No. bicycle parking spaces, bus and car set down / pick up facilities, 3 No. hard play court areas, grass play areas, hard and soft landscaping and boundary treatments and associated development works. The site is adjacent to the Lower Shannon SAC. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application and will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority
View the full application file on the council's planning portal →Application Timeline
Application received
27 Aug 2024
Decision due
21 Oct 2024
Decision: CONDITIONAL
21 Oct 2024
Grant issued
25 Nov 2024
Application Details
- Location
- Ardscoil Mhuire , College Park , Corbally
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 1.2 ha
Timeline
- Registration Date
- 27 August 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 October 2024
- Grant Date
- 25 November 2024
- Permission Expires
- 24 November 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
two temporary classrooms and associated site works
Ardscoil Mhuire , Corbally , Limerick.
an additional entrance and signage to retail unit on the east elevation together with all associated site works
SuperValu , Grove Island , Corbally Limerick.
car wash, car wash plant room with water recycling system, re--location of existing waste compactor unit and all associated structures, drainage and site development works
Circle K Corbally Service Station , Corbally Road , Corbally Co. Limerick
a change of use of the existing premises from a former hardware store to a takeaway restaurant, together with all associated site works
Unit 3 , Grove Island , Corbally Co. Limerick
a change of use from retail use to restaurant and takeaway use
Unit 10/11 Grove Island , Corbally , Limerick.
a pay-to-use waste portable compactor for dry recyclables and a pay-to-use portable waste compactor for residual waste and food waste
Topaz Service Station , Corbally Road , Corbally Co. Limerick.
the Sub-division and Change of use of an Existing Pub and Function Room at unit 5, Corbally Centre to the following: 5 No. separate uses (a) Coffee shop on the ground floor, (b) Retail unit on the ground floor, (c) Nail Salon on the ground floor, (d) Office on the first floor, (e) Commercial kitchen in the basement. Including all associated elevational changes, revised vehicle parking arrangement to the rear, enlarged communal bin store and the addition of sheltered bicycle parking and all ancillary site development works
Unit 5 , Corbally Centre , Corbally Road
change of use from a coffee shop (previously permitted under planning application reference 24/60815) to an Audiologist
Unit 5 Corbally Centre , Corbally road , Limerick.
the (1) Change of use of first floor into staff and administrative area ancillary to the running of the montessori, (2) Replacement of the original flat roof to the existing single storey side elevation with a pitched roof, (3) Replacement of original window to the existing single storey side elevation with double doors, (4) Construction of new covered single storey outdoor classroom at the rear of the Montessori (Built 2021), (5) Widening of the original vehicular entrance to facilitate off-street parking ancillary to the montessori, (6) All ancillary site works
29 Richmond Park , Corbally , Co. Limerick
the change of use of the existing ground floor montessori reverting back to residential use and for permission for retention of the following; (1) – Replacement of the original flat roof to the existing single storey side elevation with a pitched roof, (2) – Replacement of original window to the existing single storey side elevation with double doors, (3) – Widening of the original vehicular entrance to facilitate off-street parking, (4) – All ancillary site works
29 Richmond Park , Corbally , Limerick