2460875
N/ATipperary - Tipperary County Council
Proposed Development
extensions & alterations to existing farmhouse, permission for new septic tank & percolation area and a new vehicular entrance and to include all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Killoran , Templetuohy Thurles , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.23 ha
Timeline
- Registration Date
- 14 October 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
extensions and alterations to existing farmhouse, relevant demolition works to structures attached to house to facilitate the extension and renovation of the house, permission for new septic tank and percolation area, a new vehicular entrance and to include all associated site works
Killoran , Templetuohy Thurles , Co. Tipperary
change of design and subsequent boundary adjustment to granted planning permission Ref: 2460918
Killoran , Templetuohy Thurles , Co.Tipperary
the development will consist of a Phase III mushroom substrate (compost) production facility and will involve the construction of an administration building (296.16 sq. m), storage building (8444.04 sq. m), bunker building (9967.59 sq. m), tunnel building (10628.75 sq. m), woodchip bio-filter, wheelwash, weighbridge, 6 no. water storage tanks, 2 no. fuel storage tanks, well, wastewater treatment system, hardstanding areas, internal access roads, parking facilities, boundary fencing, landscaping, and all ancillary works. An Environmental Impact Statement (EIS) will be submitted with the planning application. The application relates to development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence or a Waste Licence
Killoran , Moyne , Thurles
construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1 no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level. The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pellet storage silo (c. 12.5 m in height); Combined Heat and Power (CHP) plant and associated heat exchanger; a single storey bio-based fertiliser processing and storage unit (c. 3,890 sq m GFA) (including digestate dewatering plant, fertiliser pasteurisation plant and bio-based fertiliser loading facilities); a single storey office building (c. 105 sq m GFA) (including offices, meeting room, control room, laboratory, welfare facilities, storeroom and a first-aid facility); bin storage; 9 no. car parking spaces (including 5 no. standard parking spaces, 2 no. electric vehicle (EV) spaces and 1 no. accessible car parking space); electric vehicle (EV) charging infrastructure; 10 no. bicycle parking spaces; vehicular, cyclist and pedestrian access / egress and associated circulation routes; 2 no. weighbridges; a vehicle steam wash area; fuel storage tank and associated bund; an emergency flare (c. 7.6 m in height); a process area runoff lagoon; an attenuation pond; an ESB sub-station; boundary treatments [including gates, piers and fencing]; site lighting; all hard and soft landscaping; provision of sustainable urban drainage systems (SUDS); and all other associated site excavation, infrastructural and all other associated site excavation
Former Lisheen Mine Site , Killoran Moyne , Thurles Co. Tipperary
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional windows to the front and rear elevations with an external perforated printed mesh screen fixed to the front and south gable elevation, canopy over the front entrance door and an array of PV Panels fixed to the roof 5) Landscape works including a waste water treatment plant and car parking with 4 no. electric vehicle chargers
Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary
agricultural development consisting of a new shed for storing straw/hay and to construct an extension to existing slatted shed with all associated site works
Killoran , Moyne , Thurles
the existing agricultural shed in the North West corner of farm yard
Killoran , Moyne , Thurles
the existing agricultural shed in the North West corner of farm yard
Killoran , Moyne , Thurles
works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report
Killoran , Templetuohy , Co Tipperary
development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed percolation area, attenuation tank, bored well & water storage tank, rainwater harvesting tank, emergency storage tank, solar panels to roof of existing building and all associated siteworks - application is accompanied by an NIS
Killoran , Thurles , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?