Application Timeline

  1. Application received

    8 Aug 2024

  2. Decision due

    2 Oct 2024

  3. Decision: CONDITIONAL

    2 Oct 2024

  4. Grant issued

    11 Nov 2024

Application Details

Location
Connemara Coast Hotel , Coisméig Mór Na Forbacha , Co. na Gaillimhe
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
5.51 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
8 August 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
2 October 2024
Grant Date
11 November 2024
Permission Expires
10 November 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
181575CONDITIONAL6 Nov 2018

to replace existing gazebo with new covered gazebo to hold outdoor wedding ceremonies and other uses ancillary to hotel use, with associated landscaped areas and services. Gross floor space of proposed works: 28 sqm. Gross floor space of any demolition: 10 sqm

Na Forbacha ,

9m
24338CONDITIONAL25 Nov 2024

for the construction of new staff changing room, staff canteen, alterations to the kitchen and delivery area and associated site works. Retention of ESB substation, oil tank with bunding, storage rooms and outdoor hot tub. Gross floor area of proposed works: 96.00 sqm, 9211 sqm(extension)

Coisméig Mór , Na Forbacha , Co na Gaillimhe

9m
211510CONDITIONAL19 Aug 2021

for a) alterations to roof to include 7 No. additional dormer windows, additional velux rooflights and changes to roof profile over single storey corridor on South elevation b) elevational alterations to include amended fenestration arrangements and additional doors c) amended balcony at 1st floor level d) all windows at ground and lower ground level of the Eastern bedroom wing have been brought flush with the building façade e) alterations to hard landscaping areas immediately adjacent to the hotel building. Permission is also sought for a new access ramp at the front entrance. Gross floor space of work to be retained: 76 sqm

Coismeéig Mór ,

9m
2361554N/A21 Dec 2023

for the construction of a coastal sill, hard and soft landscaping, together with amenity pathways and all associated site works. A Natura Impact Statement will be submitted to the planning authority with this application

Coisméig Mór , Na Forbacha , Co. na Gaillimhe

164m
212136CONDITIONAL17 Nov 2021

(1) Permission for two storey extension to side of existing dwelling house (2) New 1st floor balcony to rear of existing dwelling house and (3) All associated site works. Gross floor space of proposed works: 65.4 sqm.

Coisméig Mór ,

195m
181492CONDITIONAL19 Oct 2018

for development to consist of alterations and additions to the existing dwelling house including : a two storey side extension and the provision of a domestic garage and all associated site works. Gross floor space of proposed works: (dwelling) 34.5 sqm. (garage) 17.5 sqm

No. 2 An Fearbaun Coismeg Mór ,

195m
2461401CONDITIONAL23 Oct 2024

for alterations and additions to the existing dwelling house including; a two storey side and rear extension, ground floor front extension with a domestic garage and all associated site works. Gross floor space of proposed works: 134 sqm (Extension), 30 sqm (Garage)

Coismeg Mór , No. 2 an Fearban Furbo , Co. Galway

230m
171629REFUSED13 Nov 2017

to construct a dwellinghouse and all associated site works including the provision of a treatment system, previously approved under planning reference 10/129 (gross floor space 445sqm). Previous planning reference no 12/1442.

Coismeag Mór ,

230m
1895UNCONDITIONAL2 Feb 2018

to construct a dwellinghouse and all associated site works including the provision of a treatment system (Planning Ref. No. 12/1442)

Coismeig Mór ,

237m
21943CONDITIONAL31 May 2021

for a new dwelling house with a domestic garage, an on site sewerage treatment system, a new site access and all associated site works. Gross floor space of proposed works: 284.12 sqm

Coisméig Mór ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?