2461093
N/ATipperary - Tipperary County Council
Proposed Development
retention and completion of 5 no single storey dwellings which have been constructed to roof level, connections to existing services, site entrances and all associated siteworks
View the full application file on the council's planning portal →Application Details
- Location
- Ardmayle East , Boherlahan , Cashel
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 0.19 ha
Timeline
- Registration Date
- 12 December 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
completion of 5 no single storey dwellings which have been constructed to roof level, connections to existing services, site entrances and all associated siteworks
Ardmayle East , Boherlahan , Cashel Co Tipperary
23 no. dwelling houses comprising 16 no. Type A - two storey four bedroom semi detached, 2 No. Type B – two storey three bedroom semi detached, 1 No. Type C1 – two storey four bedroom detached, 2 No. Type C2 – two storey four bedroom detached, 1 No. Type E1 – four bedroom two storey detached, 1 No. Type E2 – four bedroom two storey detached. The 2 No. detached dwellings, Type E1 and Type E2, are to be located along the R660 road each with separate vehicular access off this road to each dwelling. The proposed development includes vehicular connection through the existing Longfield Park estate entrance, connection to existing services, the completion of public open space, and all associated infrastructure works. This development forms the proposed completion of an unfinished permitted development under Planning Ref. No. 04/1574
Longfield Ardmayle East , Boherlahan , Tipperary
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works under clause B 42 (1A)(a)(V)
Longfield Park , Boherlahan , Cashel
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works
Ardmayle East , Boherlahan , Cashel
51 no. dwellings consisting of 20 no. detached, 28 no. semi detached and 3 no. duplex apartments, a creche development with separate site entrance, main service road, main site entrance to include all associated site development works under clause B 42 (1A)(a)(V)
Ardmayle East , Boherlahan , Cashel
the development of 23 no. dwelling houses comprising 16 no. Type A - two storey four bedroom semi detached, 2 No. Type B – two storey three bedroom semi detached, 3 No. Type C – two storey four bedroom detached, 2 No. Type E – four bedroom two storey detached, vehicular connected through the existing Longfield Park estate entrance. The 2 No. detached Type E dwellings are to be located along the R660 road with its access off this road only. The proposed development includes connection to existing services, the completion of public open space and this development forms the proposed completion of an unfinished permitted development under Planning Ref. No. 04/1574
Longfield Ardmayle East , Boherlahan , Tipperary
construction of a dwelling, garage, entrance treatment, services connections and all associated works
Site D The Crescent , Boherlahan , Cashel
a dwelling, garage, entrance, treatment, services connections and all associated works
Site D The Crescent , Boherlahan Cashel , County Tipperary
a dwelling, entrance treatment, services connections and all associated works
Site C The Crescent , Boherlahan Cashel , Co. Tipperary
the construction of a dwelling, site entrance, domestic storage shed, service connections and all associated site development works
Site A The Crescent , Boherlahan , Cashel
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?