The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2461151

CONDITIONAL

Galway - Galway County Council

Proposed Development

to construct a new dwelling, domestic garage, septic tank, effluent treatment system and percolation area and all associated works. Gross floor space of proposed works: 280.30 sqm (house) & 50.76 sqm (garage)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Sept 2024

  2. Further information requested

    18 Oct 2024

  3. Further information received

    30 Oct 2024

  4. Decision: CONDITIONAL

    8 Jan 2025

  5. Decision due

    10 Jan 2025

  6. Grant issued

    17 Feb 2025

Application Details

Location
Bullaun , Annagh Hill , Ballyglunin
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.25 ha
Floor Area
280.3 sq m
Residential Units
1

Timeline

Registration Date
2 September 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 January 2025
Grant Date
17 February 2025
Permission Expires
16 February 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

152m
2360854CONDITIONAL27 Jul 2023

of: 1. changes to front windows & roofline; 2. new front porch; 3. new slate roof including new pitched roof over existing garage flat roof; & 4. internal alterations to existing dwelling & ancillary works

Bullaun , Ballyglunin , Tuam Co. Galway

154m
2461166CONDITIONAL4 Sept 2024

to construct a dwelling house, domestic garage, effluent treatment system, percolation area and all associated works. Gross floor space of proposed work: 205.70 sqm (house) & 60.00 sqm (garage)

Annagh Hill , Ballyglunin , Tuam

154m
2561421CONDITIONAL1 Oct 2025

for change of house plans from those previously granted under planning permission reference number 24/61166 and all ancillary site works

Annagh Hill , Ballyglunin , Co. Galway

204m
23306CONDITIONAL27 Jul 2023

to construct a dwellinghouse, sewage treatment system & garage together with all associated site works

Annagh Hill , Ballyglunin , Co. Galway

462m
17681CONDITIONAL12 May 2017

for development consisting of; a 30m multi-user free standing structure carrying telecommunications equipment together with associated exchange cabinets and fencing with access track at Annagh Hill, Ballyglunin, Tuam, Co. Galway. The development will carry telecommunications apparatus that will form part of Vodafone Ireland's GSM, 3G and 4G network.

Annagh Hill ,

470m
22535CONDITIONAL21 Apr 2022

to a) retain dwelling house on revised site boundaries b) retain minor elevations changes c) retain domestic garage as completed d) retain revised location of septic tank and percolation area e) retain revised location of site entrance. Gross floor space of work to be retained: Dwelling: 231 sqm, Garage: 56 sqm.

Barnaboy ,

661m
2260411CONDITIONAL28 Apr 2022

of an extension to both the side and front of existing commercial workshop, and permission is also sought to retain a domestic garage.Gross floor space of work to be retained 135.00 sqm.

Ballybrone ,

674m
201377REFUSED24 Sept 2020

to retain an extension to both the side and front of existing commercial workshop and on a revised site boundary to that granted permission under planning reference 96/2659. Gross floor space of works to be retained: 37.4 msq.

Ballybrone ,

707m
191269CONDITIONAL14 Aug 2019

for the construction of a dwelling house, detached garage, treatment plant and percolation area and all associated works. Gross floor space of proposed works: Dwelling - 186 sqm, Garage - 60 sqm

Ballybrone ,

747m
2460685CONDITIONAL7 Jun 2024

to construct a dwelling house (125 m2), domestic garage/fuel storage shed (60 m2), waste water treatment system and percolation area and all ancillary site works

Annagh , Ballyglunin , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?