2461283
CONDITIONALLimerick - Limerick County Council
Proposed Development
a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle charging bays and 4no. charging points (ii) installation of new EV canopy with associated illuminated signage, (iii) new modular ESB Substation, (iv) new EV banner signage, (v) associated revisions to forecourt including new road markings, pedestrian crossing point and 2m high masonry blast wall along northern boundary and, (vi) all other associated site development and drainage works
View the full application file on the council's planning portal →Application Timeline
Application received
19 Dec 2024
Further information requested
21 Feb 2025
Further information received
8 Apr 2025
Decision: CONDITIONAL
15 Aug 2025
Decision due
18 Aug 2025
Grant issued
18 Sept 2025
Application Details
- Location
- Circle K Ballysimon , Ballysimon Road , Limerick
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
- Site Area
- 0.339 ha
Timeline
- Registration Date
- 19 December 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 August 2025
- Grant Date
- 18 September 2025
- Permission Expires
- 17 September 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a pay-to-use waste portable compactor for dry recyclables and a pay-to-use portable waste compactor for residual waste and food waste
Topaz Service Station , Ballysimon Road , Limerick.
1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 19sq.m, 1 no. covered shelter with a floor area of 38sq.m and 38m of 2.6m high boundary wall and associated ground works
Circle K Service Area , Ballysimon Road , Ballysimon Co. Limerick.
replacement boundary with security fencing to rear of commercial units 1 to 6A including all ancillary works
Crossagalla Industrial Estate , Ballysimon Road , Limerick
the removal of the hedge and the erection of a 2.50m high steel fence along the Ballysimon Road, the installation of a roller shutter door to rear of unit no. 2 and all associated ancillary site development works and Permission to plant a landscape scheme along and to construct modifications to the existing 2.50m high steel fence along the Ballysimon Road, to construct 4 no. Kitchen Hub Unit (total area approx. 370sq.m.) and associated signage, and a vehicle access road, turning area and parking in the forecourt area to Ballysimon Road and all associated ancillary site development works.
Units 1B 2 + 3 Crossagalla Industrial Estate , Crossagalla Tld. Ballysimon Road , Co. Limerick
Retention permission for wash bay along with underground interceptor trap in rear (north) yard of unit, and b) planning permission for creation of 8 No. carparking spaces and pavement to front (south) of unit
The Former Brooks Building , Tipperary Road , Ballysimon
signage as constructed to existing restaurant building and for signage as constructed within site boundary. To include all ancillary associated site works for the development
Supermacs at Ballysimon Road , Limerick
signage and the installation of rear access point for vehicles to industrial unit by means of warehouse door and rear window, including all ancillary works
Unit 2 Crossagalla Industrial Estate , Ballysimon Road , Limerick
Metal Recycling Facility including a weighbridge and office
Monoclino Industrial Estate , Ballysimon Road , Limerick
the following: a change of use of existing commercial unit to car wash & valeting centre, car wash area fronting the unit, shelter for free standing dog wash, 2 No. totem roadside signs, building signage together with all associated site works
Monoclinoe Industrial Estate , Ballysimon Road , Limerick.
a new totem sign to replace the existing totem sign and all ancillary site works
Monoclino Industrial Estate , Ballysimon Road , Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?