The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2461489

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SEWER INCLUDING ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Sept 2024

  2. Decision: CONDITIONAL

    7 Nov 2024

  3. Decision due

    14 Nov 2024

  4. Grant issued

    11 Dec 2024

Application Details

Location
MAGHERACLOGHER , DERRYBEG , LETTERKENNY PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.052 ha
Floor Area
68.93 sq m
Residential Units
1

Timeline

Registration Date
20 September 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 November 2024
Grant Date
11 December 2024
Permission Expires
10 December 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

80m
2460716CONDITIONAL16 May 2024

MEADÚ DE DHÁ STÓR A CHUIR LE TAOBH AN AMHAIRCLAINN INA MBEIDH (1) CISTIN AGUS MEADÚ LEIS AN BIALANN, (2) SEOMRA FUAIM, LEITHRISÍ, SEOMRA CLEACHTADH, OIFIG AGUS ÁIT STÓRAILE AR AN CHÉAD URLÁR

ARD NA GCEAPAIRÍ , NA DOIRÍ BEAGA , LEITIR CEANAINN

131m
1950721CONDITIONAL13 May 2019

DEMOLITION OF EXISTING SCHOOL BUILDING (S) KNOWN AS "ARDSCOIL MHUIRE" AND THE CONSTRUCTION OF 30 NO. DWELLING UNITS (2,3,4 & 5 BEDS), CONNECTION TO EXISTING STORM DRAINAGE NETWORK ON PUBLIC ROAD (R-257-12), COLLECTION OF FOUL SEWAGE TO NEW ON SITE PUMPING STATION AND THEREAFTER PUMPED TO REAR (EAST) OF SITE INTO PROPOSED NEW 350M LONG GRAVITY FOUL SEWER IN A SOUTH EAST DIRECTION ALONG PUBLIC ROAD (L-1383-1) CONNECTING TO EXISTING FOUL SEWER AT INDUSTRIAL ESTATE ROUNDABOUT INCLUDING ALL ASSOCIATED SITE WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

144m
2051368CONDITIONAL25 Sept 2020

(1) REMOVAL OF FIRST FLOOR ROOF PROFILE (2) INCREASED ROOF HEIGHT WITH NEW ROOF PROFILE WITH ASSOCIATED ELEVATIONAL AMENDMENTS (3) CONSTRUCTION OF A NEW SIDE ACCESS ENTRANCE WITH ESCAPE STAIR CASE AND BIN STORAGE UNDER (4) EXTENSION TO THE REAR & SIDES OF THE PREMISES TO CATER FOR NEW FIRST FLOOR MULTI-PURPOSE ROOM WITH ASSOCIATED BAR FACILITY, RESTAURANT AREA, MUSIC LOUNGE, TOILETS FACILITIES AND STORES / CHANGING ROOM (5) ERECTION OF NEW SMOKING ROOM AND (6) ERECTION OF NEW SITE SIGNAGE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS

ARDNAGAPPERY , MIDDLETOWN , DERRYBEG

183m
2660598N/A9 Apr 2026

CONSTRUCTION OF 6 NO. DWELLING HOUSES COMPRISING OF 2 NO. SEMI-DETACHED DWELLING UNITS, 3 NO. TERRACED DWELLING UNITS AND 1 NO. DETACHED GROUP HOME AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT SHALL BE ACCESSED THROUGH THE RADHARC AN OILEÁIN HOUSING ESTATE VIA R257 AND SERVED BY THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721

RADHARC AN OILEÁIN , MAGHERACLOGHER , DERRYBEG LETTERKENNY PO

183m
2660895CONDITIONAL19 May 2026

CONSTRUCTION OF 6 NO. DWELLING HOUSES (2 NO. SEMI-DETACHED DWELLING UNITS, 3 NO. TERRACED DWELLING UNITS AND 1 NO. DETACHED GROUP HOME) AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE DEVELOPMENT SHALL BE ACCESSED THROUGH THE RADHARC AN OILEÁIN HOUSING ESTATE VIA R257, AND SERVED BY THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721

RADHARC AN OILEÁIN , MAGHERACLOGHER , DERRYBEG LETTERKENNY PO

191m
2350824N/A9 Jun 2023

CONSTRUCTION OF 5 NO. ADDITIONAL SINGLE STOREY 2 BEDROOM DWELLING UNITS (4 NO. SEMI-DETACHED, 1 NO. DETACHED) AS A PHASE 2 TO THE PREVIOUSLY GRANTED HOUSING DEVELOPMENT UNDER PLANNING REF NO. 19/50721. PHASE 2 SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES OF THE PREVIOUSLY GRANTED HOUSING DEVELOPMENT (PLANNING REF NO. 19/50721) TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

192m
2450063CONDITIONAL26 Feb 2024

EXISTING ACCESS ROAD AND ENTRANCE FROM PROPERTY ON TO THE FACTORY ROAD

ARDNAGAPPERY , DERRYBEG , CO. DONEGAL

193m
2351119CONDITIONAL27 Jul 2023

CONSTRUCTION OF A PHASE 2 TO PREVIOUSLY PERMITTED HOUSING DEVELOPMENT UNDER PLANNING REF. NO. 19/50721 WHICH CONSISTS OF CONSTRUCTION OF (1) 4 NO. ADDITIONAL SEMI-DETACHED SINGLE STOREY (2 BED) DWELLING UNITS AND (2) 1 NO. DETACHED GROUP HOME IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF NO. 19/50721. THE DEVELOPMENT SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721, TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

193m
2461289CONDITIONAL26 Aug 2024

AMENDMENT TO PREVIOUSLY PERMITTED HOUSING DEVELOPMENT UNDER PLANNING REF. NO. 23/51119, THE AMENDMENT CONSISTS OF THE REPLACEMENT OF 5-BED GROUP HOME WITH 2 NO. ADDITIONAL SEMI-DETACHED, 2-BEDROOM SINGLE STOREY DWELLING UNITS. THE DEVELOPMENT SHALL BE ACCESSED THROUGH AND SERVED BY EXTENDING THE APPROVED ACCESS ROAD AND SERVICES PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 19/50721 AND 23/51119 TO INCLUDE ALL ASSOCIATED SITE DEVELOPMENT WORKS

MAGHERACLOGHER , BUNBEG , LETTERKENNY PO

228m
1750647REFUSED28 Apr 2017

CONSTRUCTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM

ARDNAGAPPRY , DERRYBEG , LETTERKENNY PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?