The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2461791

N/A

Galway - Galway County Council

Proposed Development

1) Chun foirgneamh seomra feistis aon stóir (101.8 m.cr.) a scartáil, 2) Foirgneamh áis spóirt pobail dhá stóir a thógáil (méadar cearnach iomlán de 1,201.1) lena n-áirítear 4 sheomra feistis, halla spóirt agus limistéar áineasa comhchoiteann, 3) Tógáil Gléasra cóireála eisiltigh agus limistéar síothlaithe, chomh maith le Córas Séarachais atá ann a díchoimisiúnú, agus 4) Athruithe a bhaineann leis an carrchlós atá ann cheana agus seirbhísí eile atá bainteach leis an suíom. Spás urláir comhlán na n-oibreacha beartaithe: 1201.10 sqm. Spás urláir comhlán d’aon scartáil: 101.80 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Dec 2024

  2. Further information requested

    21 Feb 2025

  3. Application withdrawn

    27 Aug 2025

Application Details

Location
An Chloch Scoilte , Barna GAA Club , Co. Na Gaillimhe
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.461 ha

Timeline

Registration Date
20 December 2024
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
27 August 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

341m
21900REFUSED26 May 2021

for the construction of a new 2-storey detached dwelling house (floor area of house 204.46 sqm) and garage including waste water treatment plant, willow tertiary system and percolation area and all associated site works and ancillary services. Gross floor space of proposed works: incl. garage 229.46 sqm

Truskey West ,

342m
20704REFUSED9 Jun 2020

construction of a new 2 storey detached dwelling house (floor area of house 204.46sqm), a garage including waste water treatment plant and percolation area and all associated site works and ancillary services. Gross floor space of proposed works; (inc garage) 229.46sqm

Truskey West ,

353m
2360613CONDITIONAL7 Jun 2023

to construct a two storey dwelling, a detached garage including wastewater treatment plant & percolation & all associated site services & landscaping

Truskey West , Barna , Co. Galway

377m
2460858CONDITIONAL10 Jul 2024

to construct a two storey dwelling, a detached garage including waste water treatment plant and percolation and all associated site services and landscaping. Gross floor space of proposed works: 225 sqm (house) & 48.88 sqm (garage)

Troscaigh Thoir , Barna , Co. Galway

377m
2560937CONDITIONAL11 Jul 2025

for a change of house type to a two-storey dwelling from that approved under Pl. Ref. No. 24/60858 and all associated site development works. Gross floor space of proposed works: 224 sqm(H), 48.88 sqm(G)

Troscaigh Thoir , Barna , Co. Galway

442m
2260065N/A4 Feb 2022

to construct a dwelling house, domestic garage, on site sewage treatment system, new site access and all associated site works. Gross floor area of proposed works 275.33 sqm (dwelling house) & 28sqm (garage).

LOCH INSE ,

442m
21468N/A26 Mar 2021

dwelling house, domestic garage, on site sewage treatment system, new site access and all associated site works. Gross floor area of proposed works dwelling 275.33 sqm , garage 28sqm.

Barna ,

445m
2260672CONDITIONAL1 Jul 2022

for an agricultural entrance & all associated site works.

Loughinch ,

509m
2560410CONDITIONAL11 Apr 2025

for the construction of a dwelling house, shed/store car port and private wastewater treatment system with all associated works and ancillary services. Gross floor space of proposed works: 207.70 sqm(H), 11.40 sqm(shed/store)

An Chloch Scoilte , Cloghscoltia Barna , Co Galway

511m
212188N/A24 Nov 2021

for a dwelling house, garage/shed and private wastewater treatment system with all associated works and ancillary services. Gross floor space of proposed works: 200 sqm (house) & 60 sqm (garage)

CLOGHSCOLTIA ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?