The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

2468

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

the change of use from existing retail store to cafe donut shop for sale of food and drinks for consumption within and off the premises internal seating area, alterations to existing unit in accrodance with the lodged plans and documents to include and all associated/ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2024

  2. Decision: CONDITIONAL

    24 Apr 2024

  3. Decision due

    28 Apr 2024

  4. Grant issued

    28 May 2024

Application Details

Location
Unit 11x , The Shopping Centre , Dooradoyle
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
4 March 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 April 2024
Grant Date
28 May 2024
Permission Expires
27 May 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

53m
22631CONDITIONAL3 Jun 2022

(i) the construction of a mezzanine extension (145 sq.m) in units 05x and 06x (amalgamation of the two units was declared exempted development under Reg. Ref. EC 029-22), increasing the total floor area of the combined units to 1175 sq.m; (ii) all associated and ancillary site works

Units 05-06x Crescent Shopping Centre , Dooradoyle , Co. Limerick

71m
23301CONDITIONAL6 Jun 2023

the development that will consist of: (i) internal alterations to facilitate restaurant fit-out consisting of waiting area, kitchen, serving area, dining area, freezer, chiller, staffroom/office, disabled toilet, and waste storage area all at ground floor and a storage room, office, staffroom, staff toilet, customer toilets, and dining area at mezzanine floor; (i) erection of new staircase connecting mezzanine floor to main dining area on ground floor; (iii) minor alterations to existing external shop front to comprise etched vinyl manifestation applied to internal glazing, insertion of sliding hatch within existing glazing, and existing fire door to be widened; (iv) installation of new glazed mall shopfront (v) fascia level signage fitted with LED lights to external elevation and internal elevation with mall; (vi) delivery of food orders from the premises by delivery companies or tenant; (vii) and all associated works to facilitate the development

Unit 24XB , Crescent Shopping Centre , Dooradoyle Road

96m
23266CONDITIONAL23 May 2023

the development that will consist of the removal of the existing external manifestations along the pedestrian entrances for the Shannon Mall, Omniplex Mall, Garryowen Mall, Library Mall, Dooradoyle Mall and City Mall and replacement with new signage and full size, optically clear vinyl manifestations on glass entrances in the design of the new Crescent Shopping Centre logo

The Crescent Shopping Centre , Dooradoyle , Co. Limerick

101m
18742CONDITIONAL20 Jul 2018

the subdivision of Unit No. 23 into 2 no. 69sq.m mall units for non-retail (No.23) and retail (No.23b) use; the amalgamation of new retail mall unit No.23b (69sq.m) with No.23a (285sq.m) to create 1 no. mall unit to be known as unit no. 23a; the extension of the new unit no.23a to the rear at ground level by 105sq.m; extension at mezzanine level by 319sq.m for retail trade; modifications to internal shopfront and signage to reflect the proposed reconfiguration of existing units; external elevation upgrade; and all other ancillary works

Unit 23 Crescent Shopping Centre , Dooradoyle , Co. Limerick.

113m
18554CONDITIONAL5 Jun 2018

the subdivision of Unit No. 23 (c.141sq.m) to create 2 no. separate mall units to be referred to as Unit No. 23 (c.69sq.m) and Unit No. 23b (c.69sq.m); the change of use of new Unit No. 23 from 'Retail' to 'Non-Retail Services' (c.69sq.m); modifications to the shopfront and signage to reflect the proposed subdivision; and all other ancillary works

Unit 23 Crescent Shopping Centre , Dooradoyle , Co. Limerick.

149m
2444CONDITIONAL14 Feb 2024

the amalgamation of the Tesco retail unit (Unit 43) (c.3,543.06 sqm gross floor area at ground floor level) and adjacent single level vacant unit (situated to the rear of Units 41 & 42) (c.865.43 sqm gross floor area and the change of use of the vacant unit, former creche facility, to retail including the subsidiary sale of alcohol. The proposed development includes the relocation of the alcohol sales area (c. 136 sqm area to the rear of the amalgamated retail unit (c.4,408.49 sqm gross floor area at ground floor level), minor internal and external alterations including new means of escape stairs, doors and roller shutter, demolition of internal walls (c.44.71 sqm area) and all necessary enabling works

The Tesco retail unit(Unit 43) and adjacent vacent unit(situated to the rear of Units 41 & 42) , The Crescent Shopping Centre , Dooradoyle Road

152m
24450CONDITIONAL3 Dec 2024

(i) 1 no. illuminated Tesco sign (c.7.31 sqm in area) to the north east elevation of the Tesco Unit and; (ii) 1 no. illuminated Tesco sign (c.7.31 sqm in area) to the south east elevation of the Tesco Unit

Tesco Unit Crescent Shopping Centre , Dooradoyle Road , Dooradoyle Co. Limerick.

192m
2660935N/A14 Aug 2026

the change of use of the permitted retail unit located in Unit 17, Crescent Shopping Centre, with a GFA of 139.4 sqm, to a café/restaurant unit use, and all associated works

Unit 17 , Crescent Shopping Centre , Dooradoyle Co. Limerick

195m
17284CONDITIONAL3 Apr 2017

amendments to the development permitted under Limerick City and County Council Planning Application Reference 16/241. The proposed amendments will comprise: the subdivision of Unit 9-10 to create 2 no. standalone retail units; change of use of Unit 8 (35 sq.m) from retail service to retail and subdivision and change of use of part of Unit 6-8a (61 sq.m) from café to retail and the amalgamation of these spaces with Unit 9 to create a single retail unit measuring approx. 209sq.m; the amalgamation of Unit 10 and Unit 36 and the construction of a storage/ancillary mezzanine level within Unit 10 measuring approx. 118 sq.m of space to create a single retail unit measuring approx. 408 sq.m; the relocation of existing fire escape door at Unit 9; installation of a new fire escape door at Unit 10; and; all ancillary works. The proposed development will result in café Unit 6-8a (280 sq.m), retail Unit 9 (209 sq.m), retail Unit 10 (408 sq.m) increasing the gross retail floorspace by approx. 214 sq.m representing a net increase in floorspace by approx. 118 sq.m.

City Mall , Crescent Shopping Centre , Dooradoyle Limerick

200m
2460574CONDITIONAL11 Jun 2024

internal alterations to amalgamate the former Tesco retail unit [GIA 1,070.6 sq.m] into the adjoining existing Penney's retail unit, which is located to the northwest of the ‘Shannon Mall’. The proposed development includes; the removal of the existing partition wall between the former Tesco retail unit and existing Penney's retail unit, the removal of internal partitions to existing Penney's retail unit for the provision of a new internal partition through both the existing and amalgamated Penney's retail areas to accommodate a new ancillary office, administration and staff rooms; works to the existing roof structure of the former Tesco retail unit to remove asbestos sheeting and replace this with new profiled metal deck and insulation to match the existing Penney's roof structure. Permission for the removal of 2 no. existing former Tesco shopfront entrances within the Shannon Mall for replacement with new frameless glazing to match the existing Penney's shopfront, removal of existing externally mounted former Tesco signage to the northwest elevation of the Crescent Shopping Centre, installation of a new externally mounted metal cage to accommodate an air conditioning unit on the northwest elevation of the Crescent Shopping Centre to serve Penney's unit, along with the provision of 2 no. externally mounted ventilation louvres to the northwest elevation of the Crescent Shopping Centre to serve Penney's unit, removal of an existing loading dock to the northeast elevation of the Crescent Shopping Centre, removal of existing emergency exit door and external staircase to the northeast elevation of Crescent Shopping Centre, construction of new emergency exit doors and external staircase on the northeast elevation of Crescent Shopping Centre to serve Penney's unit and all associated site development and enabling works

Shannon Mall , Crescent Shopping Centre , Dooradoyle

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?