25/6738
Awaiting F.I. ResponseCork - Cork County Council
Proposed Development
Permission for retention for conversion of attic of existing dwelling for use as bedroom and bathroom and the installation of 3 no. velux roof lights to rear of dwelling all as constructed on site
View the full application file on the council's planning portal →Application Details
- Location
- 18 Dromore Drive, Ballydahin, Mallow, Co Cork
- Applicant
- N/A
- Application Type
- Permission for Retention
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 10 December 2025
- Status
- Awaiting F.I. Response
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for retention of existing porch extension to front of existing dwelling as constructed and all associated site works
42, Dromore Drive, Ballydahin, Mallow, Co. Cork. P51 X5FH
Permission for retention of existing porch extension to front of existing dwelling as constructed and all associated site works.
42, Dromore Drive, Mallow, Co. Cork, P51X5FH
permission for the erection of a 24 metre high telecommunications antennas support structure with associated equipment attached and associated equipment cabin and cabinet for use by Vodafone and with provision for use by additional operators within a palisade fenced compound using and existing access track
Micam Limited, Sean Moylan Park, Mallow, Co. Cork.
the construction of 2 no. soccer pitches, dressing room area, new parking area and all associated services in accordance with plans and particulars submitted
Ballydahin Td., Mallow Co. Cork.
Permission for the construction of an artifical soccer pitch with associated drainage items, 4 no. floodlights, 12m high ball stop netting and all associated services in accordance with plans and documents submitted
Ballydahin Td., Mallow Co. Cork.
Permission for alterations to front and side of existing dwelling and for the construction of a single storey extension to the rear of same dwelling and all associated site works
25 Dromore Drive Ballydahin Mallow Co.Cork
Construction of an extension to an existing roof plant enclosure of an industrial building. The height will increase by three metre. No additional floor area is proposed. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence (P0247-02) issued by the Environmental Protection Agency.
Sean Moylan Park Ballydahin Mallow Co. Cork
Permission for retention of foundations as constructed and permission for the erection of a single storey toilet block and storage building and associated site works.
St Gobnait's Park Ballydahin Mallow Co. Cork
The erection of a single storey toilet block and storage building (foundation already laid).
Mallow United Football Club St Gobnait's Park Ballydahin Mallow, Co. Cork
(1) Construction of an all weather playing pitch with associated surrounding fencing, ball catching nets and flood lighting; (2) Upgrade works to the existing playing pitch; (3) Forming new vehicular entrance, access road and carpark, all with associated site works and drainage.
St. Gobnait's Park Ballydahin Mallow Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?