2510
CONDITIONALLimerick - Limerick County Council
Proposed Development
a dormer type extension to the side of the house
View the full application file on the council's planning portal →Application Timeline
Application received
15 Jan 2025
Decision: CONDITIONAL
5 Mar 2025
Decision due
11 Mar 2025
Grant issued
9 Apr 2025
Application Details
- Location
- No. 1 Cuirt na hAbhann , Clarina , Co. Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 15 January 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 March 2025
- Grant Date
- 9 April 2025
- Permission Expires
- 8 April 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of 3 detached houses and 14 semi-detached houses, 17 houses in total, and ancillary site works as previously granted under Planning Application P07/1162. P07/1162 was a modification to the original Planning Application P99/2676 which was extended under P12/7106 and P17/7036
Cuairt na hAbhann , Clarina Village , Co. Limerick.
the construction of a sunroom to the rear of dwelling and the conversion of attic to an ensuite bedroom to include front and rear roof windows
No. 8 Aos Cluan , Clarina.
Extension of Duration From Ref No:15/813 (modifications and amendments to 99/2676 (extended under 12/7106) including; (1)(a) a change in the number, type, design and layout of residential units from 19 no. townhouses and 20 no. apartments (39 no. total) to 36 no. semi-detached units and 3 no. detached units; (b) revised public open space layout arrangement; (c) provision of cycle lanes and landscaping along the internal distributor road; (d) reconfiguration of car parking and access arrangements around that part of Market Hall which has been constructed to date (1 no. retail unit, 1 no. office and 14 no. apartments) and (e) all associated site works. (2) omission of a number of permitted structures including the meeting hall, communal hall and the remainder of Market Square (comprising 1 no. restaurant, 5 no. retail units, 13 no. offices and 23 no. apartments and town houses) which has not been constructed to date (the application includes an overall masterplan for the site which will provide for a nursing home in the future and will be subject to a separate planning application)
Ballybrown , Clarina
elevational changes to approved dwelling along with a garage and planning permission for the installation of wastewater treatment system and all associated development works
Clarina , Ballybrown , Co. Limerick
change surface finishes at some locations mainly from brick paving to an asphalt surface and from self binding gravel to mainly grass and shrub beds on housing development previously approved under file reference No 15/221 & 15/813
Clarina Village , Clarina , Co Limerick
stables and storage shed and all associated development works
Ballybrown , Clarina , Co. Limerick
construction of 2 no. single storey extensions to the gable end and to the rear of existing dwelling and attic conversion with permanent stairs including roof lights and gable window to existing dwelling and all associated site works
20 Cill Chaoide , Clarina , Co. Limerick
construction of a single storey dwelling house, detached domestic garage, wastewater treatment system, percolation area, improvements to existing vehicular entrance & to utilise same access to site, including all ancillary site works
Ballybrown , Clarina , Co. Limerick
the completion of the construction of 48 no. retirement houses currently in various states extension of permission (of construction along with associated site works. The 48 no. units were originally granted planning permission under 99/2676 (which was extended under 12/7106 until 2017) and construction commenced with amendments to the principal permission under 07/1252 & 07/3472)
Ballybrown , Clarina
Extension of Duration from Ref No: 15/221 (the completion of the construction of 48 no. retirement houses currently in various states of construction along with associated site works. The 48 no. units were originally granted planning permission under 99/2676 (which was extended under 12/7106 until 2017) and construction commenced with amendments to the principal permission under 07/1252 & 07/3472)
Ballybrown , Clarina
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?