The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

25117

CONDITIONAL

Clare - Clare County Council

Proposed Development

of the existing single storey utility and PERMISSION to complete works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Apr 2025

  2. Decision: CONDITIONAL

    11 Jun 2025

  3. Decision due

    16 Jun 2025

  4. Grant issued

    14 Jul 2025

Application Details

Location
Lahinch Road , Ennistymon , Co. Clare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
22 April 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 June 2025
Grant Date
14 July 2025
Permission Expires
13 July 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
221145CONDITIONAL16 Dec 2022

of existing rear extension to dwelling

Lahinch Road , Ennistymon , Co Clare

66m
20477CONDITIONAL15 Jul 2020

to develop the top floor of the existing apartment building into 2 no. apartments and all associated site and ancillary works

Bridge House Apartments , Bridge Street , Ennistymon

105m
17428CONDITIONAL1 Jun 2017

to install 1 No. Prefabricated Unit which will contain 2 No. Classrooms at Ennistymon Community College

Glencree , Ennistymon , Co. Clare

114m
20148CONDITIONAL4 Mar 2020

the development will consist of construction of an extension and alterations to existing house as follows: 1) Removal of existing roof, 2) replacement of existing corrugated steel roof in slate, with the addition of two sky lights, 2) provision of one new window opening to the front and one to the rear, 3) enlargement of one existing window opening 4) replacement of existing front windows and 5) plastering of part of one stone wall

Bow Lane , Main Street , Ennistymon

115m
25167REFUSED26 May 2025

to Extend the Appropriate Period of Planning Permission for P20/148 the development will consist of construction of an extension and alterations to existing house as follows: 1) Removal of existing roof, 2) replacement of existing corrugated steel roof in slate, with the addition of two sky lights, 2) provision of one new window opening to the front and one to the rear, 3) enlargement of one existing window opening 4) replacement of existing front windows and 5) plastering of part of one stone wall

Bow Lane , Main Street , Ennistymon Co Clare

118m
22152CONDITIONAL21 Feb 2022

for development at this site of Armsteads building (a protected structure), Bogbere Street, Ennistymon, Co. Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and associated landscaping and ancillary site works, for use as private dwelling with home office and three B&B guest rooms

Bogbere Street , Ennistymon , Co. Clare

124m
20407CONDITIONAL22 Jun 2020

the development will consist of the permanent change of use of the existing Family Resource Centre building, from community support facility to Creche and preschool, with RETENTION of the following: changes to fencing to external play area; additional fencing around main entrance; new fire escape door; replacement of door with window; and 3No storage sheds and a Polytunnel

Bogbere Street , Ardnaculla , Ennistymon

124m
17283CONDITIONAL20 Apr 2017

for development at "An Grianán", Bogbere St, Ennistymon which will consist of the temporary change of use for a period of three years of a part of the existing Family Resource Centre Building, area 115sq.m, from community support facility to Creche, construction of new rear external door and 2M high fencing to secure play area to the rear, with connections to existing services

Bogbere Street , Ardnaculla , Ennistymon

124m
17484CONDITIONAL22 Jun 2017

for development which will consist of the temporary change of use for a period of three years of part of the existing Family Resource Centre Building at An Grianán, Bogbere St, Ennistymon, Co. Clare , area 102 m2 from Community Support Facility to Preschool, and replace existing rear external door with connections to existing services

Bogbere Street , Ardnaculla , Ennistymon

126m
188000CONDITIONAL12 Jan 2018

for the development of an Inner Relief Road in Ennistymon, including a new vehicular bridge crossing of the Inagh/Cullenagh River approximately 80 metres upstream of the existing Bridge crossing. The overall route runs from a point located approximately 170 metres south east of Blake's Corner on the N85 National Road to a point located approximately 180 metres west of Blakes Corner on the N67 National Road, via Bogbere Street. The development includes the pedestrianisation of the existing bridge, the inclusion of a roundabout at the Western end of the proposed new bridge crossing on the L-1084 and the relocation of the existing public car park adjacent to New Road ( N85 ),. The development also includes the demolition of three existing properties ( two retail/residential units and one residential unit ) in the Ennistymon Architectural Conservation Area and would materially affect the character of the area concerned. In accordance with the Habitats Directive, an Appropriate Assessment Screening has been carried out on the project. An Environmental Report also accompanies this application.

Blake's Corner , Ennistymon , Co. Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?