The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

25205

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

commercial storage shed and commercial storage unit and PERMISSION for new waste water treatment system

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 Oct 2025

  2. Further information requested

    19 Nov 2025

  3. Further information received

    26 Nov 2025

  4. Decision: CONDITIONAL

    16 Dec 2025

  5. Decision due

    23 Dec 2025

  6. Grant issued

    28 Jan 2026

Application Details

Location
Tullaheady , Nenagh , Co. Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.19 ha

Timeline

Registration Date
1 October 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 December 2025
Grant Date
28 January 2026
Permission Expires
27 January 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2660497N/A23 May 2026

the boundary fencing as erected and extended hard surfaced area. PERMISSION for the demolition of an existing building, the construction of extensions to the existing commercial premises to include workshop, store, retail/display area and ancillary welfare facilities, concrete yard, vehicle parking area, widened entrance and demolition of an existing store structure, including all associated site works

Tullahedy , Nenagh , Co. Tipperary

7m
2560922N/A17 Sept 2025

storage shed & storage unit and Planning Permission for new waste water treatment system

Tullaheady , Nenagh , Co. Tipperary

121m
2660814N/A20 Aug 2026

Car Showroom as constructed which includes ancillary offices, Service Garage Workshop and ancillary site works. Permission previously granted under Planning File 19/601452

Tullaheady , Limerick Road Nenagh , Co. Tipperary

122m
19601452CONDITIONAL20 Dec 2019

1. a new car showroom with part mezzanine for ancillary offices and a workshop repair area with ancillary rooms (total area 1500 sq m). 2. a new single storey valeting/repairs building to the rear of proposed showroom/workshop (total area 325 sq m). 3. a new roadside totem sign. 4. new boundary treatments. 5. New set back vehicular entrance from Limerick Road (R445). 6. New car-parking and car storage areas for new and used vehicles. 7. Storm water attenuation and waste percolation systems, 8. Relocation of existing open drain and associated ground works and all associated site works

Tullaheady , Nenagh , Co Tipperary

122m
25229UNCONDITIONAL13 Nov 2025

1. a new car showroom with part mezzanine for ancillary offices and a workshop repair area with ancillary rooms (total area 1500 sq m). 2. a new single storey valeting/repairs building to the rear of proposed showroom/workshop (total area 325 sq m). 3. a new roadside totem sign. 4. new boundary treatments. 5. New set back vehicular entrance from Limerick Road (R445). 6. New car-parking and car storage areas for new and used vehicles. 7. Storm water attenuation and waste percolation systems, 8. Relocation of existing open drain and associated ground works and all associated site works

Tullaheady , Nenagh , Co Tipperary

227m
17600656CONDITIONAL13 Jun 2017

a new detached workshop, boundary treatment and associated works adjacent to existing commercial premises

Tullaheady , Nenagh

263m
2460954CONDITIONAL7 Nov 2024

partially complete underground store and for planning permission to complete the construction of same together with all associated works within the existing commercial premises

Tullaheady , Nenagh , Co. Tipperary

263m
2460812N/A25 Sept 2024

partially complete underground store and for planning permission to complete the construction of same together with all associated works within the existing commercial premises

Tullaheady , Nenagh , Co. Tipperary

266m
18600432CONDITIONAL11 Apr 2018

retention of the following development for a period of 2 years: Office accommodation attached to the rear of the existing commercial premises, detached store/parts shed, two number steel containers used for storage and associated works

Tullaheady , Nenagh , Co. Tipperary

337m
18600397N/A3 Apr 2018

the following development for a period of 2 years - office accommodation attached to the rear of the existing commercial premises, detached store/parts shed and 2 number steel containers used for storage and associated works located at the existing commercial premises

Tullaheady , Nenagh , Co Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?