The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

25244

CONDITIONAL

Clare - Clare County Council

Proposed Development

to build a new house, install a waste water treatment system and all associated and ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Jul 2025

  2. Further information requested

    12 Sept 2025

  3. Further information received

    9 Oct 2025

  4. Decision: CONDITIONAL

    3 Nov 2025

  5. Decision due

    5 Nov 2025

  6. Grant issued

    8 Dec 2025

Application Details

Location
Doolin Tld. , Doolin , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
23 July 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 November 2025
Grant Date
8 December 2025
Permission Expires
7 December 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
20414CONDITIONAL23 Jun 2020

to build two detached log cabins for the purpose of providing holistic therapies within the curtilage of Aille River Hostel and all associated site and ancillary works

Aille River Hostel , Doolin , Co Clare

73m
20878CONDITIONAL23 Nov 2020

to build an extension onto the existing hostel and all associated site and ancillary works

Aille River Hostel , Doolin , Co Clare

88m
17358N/A12 May 2017

for (a) RETENTION of existing Marquee Structure and all ancillary works until October, 2017, (b) PERMISSION for the continued use of the Marquee Hotel functions until October, 2017, (c) Upgrade and Extension of existing carparking areas including extension to internal access road at Hotel Doolin.

Fitz's Cross , Doolin , Co. Clare

88m
17359CONDITIONAL12 May 2017

for (a) The construction of a single storey extension to the existing hotel comprising a function room inclusive of bar, kitchen, and WC, as well as all associated site works, (b) The construction of a single storey storeroom extension to existing bin store area, (c) Upgrade and extension of existing car parking areas including extension to internal access road, all at Hotel Doolin

Hotel Doolin , Fitz's Cross , Doolin

88m
2460468CONDITIONAL27 Sept 2024

for development which will consist of the conversion of 8 No. existing holiday homes into 16 No. holiday suites, the demolition of rear garden walls, construction of external terraces to the rear and associated ancillary site works

Hotel Doolin , Doolin , Co. Clare

91m
2460397N/A22 Aug 2024

for development which will consist of the conversion of 8 No. existing holiday homes into 16 No. holiday suites, the demolition of rear garden walls, construction of external terraces to the rear and associated ancillary site works

Hotel Doolin , Doolin , Co. Clare

92m
19813CONDITIONAL24 Oct 2019

for the following works to Hotel Doolin. The works involve a) New Store area to the NE/SE Elevation b) to construct a single storey extension to the hotel in the internal courtyard area c) to construct an extension to the ground floor bar area on the SW Elevation along with associated site works

Fitz's Cross , Doolin , Co Clare

93m
19527CONDITIONAL1 Jul 2019

to RETAIN works to Doolin Hotel which involve the following: a) the external storerooms, the additional floor area on the ground floor and first floor, additional first floor bedroom, along with changes made to the North-East elevation, b) the glass roof, enclosed courtyard reception and changes made to the North-West elevation, c) the external canopy, additional floor area to the bar on the ground floor and changes made to the South-West elevation, d) the additional boiler house, service areas and changes to the North-East elevation, e) the changes made to the external elevations of Hotel Doolin in the courtyard area, f) the extension to the ground floor kitchen area, storeroom, external stairs, outside bar area and the covered walkway in the internal courtyard, g) the changes made to the external standalone store areas, h) the extension to the first floor function room, i) the extension to the building granted under P17-359, j) the external signage for Hotel Doolin

Fitz's Cross , Doolin , Co. Clare

124m
2225CONDITIONAL19 Jan 2022

the development will consist of a part one and part two storey extension to the existing hotel to include 27 bedrooms, a new hotel entrance and reception area, ancillary spaces including wellness suite (46sqm) and storage rooms. The total proposed Gross Internal Area (GIA) of the extension is 1688 sqm (Ground Floor: 1065 sqm & amp; First Floor: 623sqm). The development will include all associated site works including hard and soft landscaping, connection to existing waste treatment plant, a new vehicular set-down area, alterations to the internal road layout, additional bicycle parking and 28 new car parking spaces.

Hotel Doolin , Fitz Cross , Doolin Co Clare V95 DE2X

136m
211216CONDITIONAL17 Nov 2021

of the single storey rear extension, rear canopy, the outdoor seating area and the door to the front lobby area and PERMISSION to replace 3 windows with 3 doors on the front elevation

Teergonean , Doolin , Co Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?