The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

25265

CONDITIONAL

Galway - Galway County Council

Proposed Development

to construct a slatted shed with loose housing area to include concrete aprons and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Oct 2025

  2. Decision: CONDITIONAL

    26 Nov 2025

  3. Decision due

    27 Nov 2025

  4. Grant issued

    13 Jan 2026

Application Details

Location
Castlebin East , New Inn , Ballinasloe
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
1.52 ha

Timeline

Registration Date
3 October 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 November 2025
Grant Date
13 January 2026
Permission Expires
12 January 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
24310CONDITIONAL23 Oct 2024

to 1; construct extension to existing milking facilities shed to cover existing slatted collection area. 2; Construct extension to existing slatted/cubicle shed to cover existing slatted/cubicle area to include all associated site works at the above location. Gross floor space of proposed works: 458.21 sqm

Castlebin East , New Inn , Ballinalsoe

3m
191488CONDITIONAL26 Sept 2019

to; 1. Construct milking facilities to include parlour, dairy, store, plant room, office and associated handling / drafting facilities with slatted float channel. 2. Construct un-roofed slatted feed / collection yard to include slatted tanks, feed passages and concrete aprons. 3. Reconstruct and extend existing slatted shed to accommodate cubicles, un-roofed cubicles and slatted feed area to include slatted tanks and float channels. 3. Erect meal bin to include all associated works. Gross floor space of proposed works: 1. Milking facilities, etc. = 505.10 sqm, 2. Un-roofed feed/collection yard, etc. = 1,291.84 sqm, 3. Un-roofed cubicles, etc. = 599.36 sqm, 4. Meal bin = 7.07 sqm

Castlebin East ,

311m
2660005CONDITIONAL8 Jan 2026

to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works

Cloonatloukaun , New Inn , Ballinasloe

348m
2561317CONDITIONAL12 Sept 2025

to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works

Cloonatloukaun , New Inn Ballinasloe , Co. Galway

437m
2460912REFUSED22 Jul 2024

of the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 196.00 sqm

Castlebin South , New Inn , Co. Galway

452m
2361355CONDITIONAL13 Nov 2023

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)

Castlebin South , New Inn , Ballinalsoe

463m
2461157CONDITIONAL3 Sept 2024

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 200 sqm (house)

Castlebin South , New Inn , Co. Galway

490m
211692CONDITIONAL16 Sept 2021

the construction of an above ground installation (AGI) facility, for the maintenance of an existing gas pipeline. Proposed development will include below ground and above ground pipework, internal road accessed from L7445 road and all associated civil and earthworks. The site will be fenced by a 2.4m high security palisade and 1.2m cattle fence, with associated planting strip as visual screening. The development does not contain any new buildings or enclosures. Total site area is c. 1977 sqm/0.1977 ha.

CASTLEBIN SOUTH ,

544m
2361354CONDITIONAL13 Nov 2023

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)

Castlebin South , New Inn , Co. Galway

572m
2460585CONDITIONAL21 May 2024

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm

Castlebin South , New Inn , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?