25343

CONDITIONAL

Clare - Clare County Council

Proposed Development

of domestic gable extension / first floor increase, elevational/fenestration changes including raised ridge/soffit heights etc to existing dwelling and B & B, previously granted under Planning Ref P99-2304, plus all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Nov 2025

  2. Decision: CONDITIONAL

    15 Dec 2025

  3. Decision due

    8 Jan 2026

  4. Grant issued

    26 Jan 2026

Application Details

Location
Caherfeenick North , Doonbeg , Co. Clare V15 PD32
Applicant
N/A
Application Type
RETENTION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
5 November 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 December 2025
Grant Date
26 January 2026
Permission Expires
25 January 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

316m
2560256CONDITIONAL8 May 2025

for a) to extend existing dwelling, alterations to internal layout, alterations to external elevations and relocation of existing site entrance along with all associated works at the above address, b) Retain the change of use and alterations of private garage to an office and gym area along with all associated works

Caherfeenick , Cree , Co. Clare

349m
2460176CONDITIONAL25 Apr 2024

for renovation works and two storey extension to existing dwelling, demolition of existing sheds, new wastewater treatment system and polishing filter, all associated site works and services

Creegh Cottage Doonbeg , Caherfeenick Kilrush , Co. Clare

446m
2560838CONDITIONAL22 Dec 2025

for development of this site at Trump International Golf Links & Hotel, Doonbeg, Kilrush, Co. Clare, V15 KH39. The development will consist of: a) The demolition of the existing event marquee and its associated service areas; the demolition of Doughmore House, including its associated shed, concrete yard, boiler and plant room to the rear. All associated hardstanding, access roads, foundations, services, utilities and site infrastructure relating to the above elements will be removed. b) The construction of a new single-storey ballroom building, comprising a main function room; lobby and pre-function areas; reception space; bar and lounge areas; champagne and tea stations; bridal suite; guest WCs; staff facilities; kitchen and catering areas; chair and bar stores; internal service and plant spaces; an external service yard; and a partially covered external terrace. c) The reconfiguration, upgrading and extension of existing car parking and internal circulation areas, including revised vehicular and pedestrian routes, set-down areas, bicycle parking provision, resurfacing, lighting, and all associated hard and soft landscaping works. d) Site development and landscape works, including embankments, regrading and contouring, footpaths, paved areas, planting, boundary treatments, surface water and foul drainage works, services and utilities connections, and all works required to integrate the development into the existing hotel campus. e) All ancillary site development, excavation and infrastructural works necessary to facilitate the proposed development. A Natura Impact Statement (NIS) has been prepared for this development and is submitted with this planning application

Trump International Golf Links & Hotel , DoonbegKilrush , Co. Clare V15 KH39

456m
18930CONDITIONAL19 Nov 2018

for development including the construction of Ballroom/Function Room building; Leisure Facility building including restaurant; 53 no dwellings to be used for short term tourist accommodation; minor alterations to Doughmore house; a gatehouse; additional car parking and cycle parking. The development will also provide for the dismantling and removal of the existing Marquee structure, all associated ground works, ancillary works and enabling works and connection to existing services and facilities. The proposal will be developed on undeveloped lands previously part of planning permission P03/937 and associated permissions which have been part implemented, which provided for the construction of the existing Trump International Golf Links and Hotel and associated facilities. The development will be on a site of approx. 9.76 Ha (Circa 10Ha). This application is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR)

Trump International Golf Links and Hotel , Doonbeg , Co. Clare

734m
2460049CONDITIONAL9 Feb 2024

for development which will consist of the construction of a new internal access road with drain crossing, formalisation of staff car parking areas and minor alterations to Doughmore House, O’Dea Barn and Healy House and the external areas of each property including fencing and alterations to entrance at O’Dea Barn. The change of use of Doughmore House from Office/Administration use to Leisure/Recreation Use, the change of use of O’Dea Barn from Agricultural use to Operational/Storage Use, the change of use of Healy House from residential to Office/Administration and the Shed at Healy House to Operational/Storage use. The development includes the construction of a new boiler room, pickle ball courts, basketball court, and two soft play areas at Doughmore House and minor alterations. The provision of new windows, doors, screen fencing and minor alterations to O’Dea Barn. The construction and erection of a covered walkway and front porch, minor alterations to the existing storage building, converting an existing door to a window and minor alterations at Healy House and all associated works

Trump International Hotel and Golf Resort , Doonbeg , Kilrush Co. Clare V15 KH39

752m
20372CONDITIONAL9 Jun 2020

to extend dwelling house, to revise existing house elevations and for new site entrance.

Caherfeenick South , Cooraclare , Co. Clare

769m
178005UNCONDITIONAL21 Aug 2017

for the following development: The existing three-span bridge will be demolished. A new two-span bridge of reinforced concrete with masonry finish will be constructed including a local realignment of the N-67 at the bridge. Ancillary site development works will be necessary to facilitate the demolition and construction works

Mountrivers Bridge , Doonbeg , Co. Clare

822m
2460190CONDITIONAL1 May 2024

of existing apartment, sun room and shed

Mountrivers , Doonbeg , Co Clare

908m
2360036CONDITIONAL22 Feb 2023

to construct a new dwelling house, private garage, site entrance with connection to public sewer and all other associated site works

Mountrivers , Doonbeg , Clare

957m
21433CONDITIONAL5 May 2021

to RETAIN: 1. The house as built on site, which is a mirror image of that granted under reference P98/1903; 2 The attached Garage and Rear Porch and 3. The Detached Steeltech Storage Shed and for PERMISSION to revise the Boundaries granted under P98/1903 and all associated site and ancillary works