Permission for development at Lands adjacent to David McCarthy Road and Nash's Boreen, Knocknacullen West, Hollyhill, Cork. The development will consist of: An extension to the existing staff car park to provide additional parking spaces and associated internal roads. The development will be accessed via the permitted vehicular access points off David McCarthy Road permitted under Planning Reference: 22/41121. The development also includes boundary treatments, service gate, drainage and all ancillary site development works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Mar 2025

  2. Decision due

    19 May 2025

  3. Decision: CONDITIONAL

    19 May 2025

  4. Grant issued

    30 Jun 2025

Application Details

Location
Lands adjacent to , David McCarthy Road and , Nashs Boreen Knocknacullen West
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
25 March 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 May 2025
Grant Date
30 June 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

276m
2241121CONDITIONAL24 May 2022

Permission for the construction of a four storey over partial lower ground floor level office building providing office space, meeting rooms, staff welfare, service areas and all ancillary site development works. The proposed office building will be constructed within the existing carpark and will connect to an existing office building known as ‘HH4’ to the southeast by way of a cantilevered link corridor at first floor level resulting in façade amendments and internal reconfigurations to the existing ‘HH4’ building. A central pedestrian avenue will also be provided between the existing and proposed building. The proposed development includes a single storey commute hub building providing bicycle/scooter parking, storage and staff facilities serving the wider Apple campus, a single storey energy centre building and 2 no. single storey security huts. A new surface car park on lands to the north of the David McCarthy Road is proposed to accommodate the relocation of the displaced car parking spaces resultant from the construction of the proposed office building and provision of additional car parking spaces, in addition to the reconfiguration of the existing car park to the south of the David McCarthy Road. The proposed carpark to the north of the David McCarthy Road will be linked with the main campus via a pedestrian underpass under David McCarthy Road and a covered pedestrian pathway. 2 no. new vehicular accesses are proposed off the David McCarthy Road. Ancillary site development works include hard and soft landscaping, boundary treatments, lighting, public realm upgrades, signage, plant and photovoltaic panels and all other site development works above and below ground. An Environmental Impact Assessment Report has been prepared in respect of the planning application.

Hollyhill Industrial Estate , Tadgh Barry Road and lands , adjacent to David McCarthy Road and

325m
1737537CONDITIONAL16 Aug 2017

Permission is sought by ESB Telecoms Ltd of 43 Merrion Square East, Dublin 2 for the continued use of the existing 36 metre high communications structure, carrying radio equipment, with associated ground-mounted equipment (exempted development) shared with other licensed operators within an existing 2.4 metre high palisade fence, following on from the expiry of the parent permission LPA Ref: 12/35370 and permission to attach additional antennae and dishes to allow for future third party co-location at ESB's existing Hollyhill 38kV Substation, Hollyhill Road, Cork.

ESB's Hollyhill , 38kV Substation , Hollyhill Road

331m
2342539CONDITIONAL14 Dec 2023

Permission for the construction of a new substation building within a car park permitted under Council Ref: 22/41121 to cater for additional electrical vehicle (EV) charging points at Hollyhill Industrial Estate, Hollyhill, Cork, T23YK84. The proposed substation building will include a medium voltage switch room, electrical distribution room and all associated site development works

Hollyhill Industrial Estate , Kilmore Heights , Hollyhill

439m
1938947CONDITIONAL9 Dec 2019

Permission for an extension to the entrance lobby of an existing office building and all ancillary site development works.

Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill

539m
2240872CONDITIONAL15 Feb 2022

Permission for the construction of a new substation building consisting of a medium voltage switchroom and electrical distribution room and all associated site development works.

Hollymount 2 , (The Former Banta Site) , Hollymount Industrial Estate

542m
1938804CONDITIONAL17 Oct 2019

Permission for modifications to the elevation of an existing building and all ancillary site development works at Hollyhill Industrial Estate, Tadhg Barry Road, Holyhill, Cork. The proposed modifications consist of upgrades to the elevation of an existing office building including the addition of new windows at ground and first floor levels facing into the existing service yard. Permission is also sought for the retention of modifications to two loading bays including a ground floor extension and associated modifications to the elevations.

Hollyhill Industrial Estate , Tadhg Barry Road , Holyhill

542m
1938803CONDITIONAL17 Oct 2019

Permission for the construction of a new substation building within the existing car park to cater for additional electric car charging points at the Hollyhill Industrial Estate

Hollyhill Industrial Estate , Tadhg Barry Road , Hollyhill

555m
185114N/A3 May 2018

Importation of soil and stone, bricks, tiles, ceramics, concrete for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a new temporary entrance.

Lower Killeens , Co. Cork , .

555m
175770REFUSED10 Jul 2017

The importation of soil and stone, bricks, tiles, ceramics, concrete for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a new temporary entrance

Lower Killeens , Killeens , Co. Cork

561m
185566CONDITIONAL15 Jun 2018

Importation of soil and stone, bricks, tiles, ceramics, concrete for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a new temporary entrance

Lower Killeens , Killeens , Commons Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?