The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2544052

CONDITIONAL

Cork - Cork City Council

Proposed Development

Permission for the construction of a Fire Water Pump House, a Sprinkler Valve Enclosure, 1 no. Fire Water Tank and associated works at their existing production facility.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jul 2025

  2. Decision due

    22 Sept 2025

  3. Decision: CONDITIONAL

    22 Sept 2025

  4. Grant issued

    3 Nov 2025

Application Details

Location
Ferrero Ireland Limited , Ballycurreen , Kinsale Road
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.097 ha

Timeline

Registration Date
29 July 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 September 2025
Grant Date
3 November 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

121m
2039805CONDITIONAL23 Dec 2020

Permission for alterations to an existing warehouse including for the removal of an existing canopy and parapet wall, demolition of an existing storage building, the construction of an extension to the side of the existing warehouse and all associated site works.

John Atkins and Co. Ltd. , Metro Business Park , Ballycurreen Road

164m
2543953CONDITIONAL17 Jun 2025

Permission for retention is sought for the change of use from light industrial to a gym/fitness gym.

Motivated Fitness Gym , Unit 9 Metro Business Park , Ballycurreen Industrial Estate

184m
2140353CONDITIONAL13 Jul 2021

Permission for the demolition and removal of an existing dwelling and ancillary structures and the construction of a mixed-use residential and commercial development in 13 no. blocks comprising: 134 no. residential units in 12 no. 3-storey blocks (comprising a mix of 1,2 and 3 bed apartments/duplexes), a 3 storey neighbourhood centre building (block 10) which includes a restaurant/take-away, convenience retail, gym, dentist, physio, hairdressers and outdoor amenity at roof level; a creche (included in Block 9); a 158 no. bed hotel (Block 7, which primarily ranges in height from 6 to 9 storeys with a 2-storey annex) and which includes a swimming pool, gym, bar, cafe, restaurant and function room; a new entrance/signalised junction and improvements to the N27 including 2 no. bus stops, cycle lane and footpaths; and all associated ancillary development works including an ESB sub-station, landscaping and amenity areas, solar panels (at roof level), bin storage, car and bicycle parking.

The Kinsale Road , Ballycureen , Cork

234m
2039215N/A30 Mar 2020

Permission for phase 1 of a residential development consisting of the construction of 97 no. residential units in 2 no. blocks, 1 no. crèche, 1 no. gym and amenity areas, 1 no. bicycle workshop, the widening of existing cycle lane on the N27, the provision of access via a left-in/left-out only access, a bus stop and bus shelter, and all associated landscaping, car and bicycle parking and ancillary site development works at Kinsale Road, Ballycurreen, Cork. The proposed residential buildings are 5 and 6 storeys over lower ground floor with rooftop solar panels and amenity space.

Kinsale Road , Ballycurreen , Cork

266m
2140385CONDITIONAL27 Jul 2021

Permission to construct new two storey extension at front and side of dwelling house (ie. west facing side), to replace existing pitched roof on existing rear single storey extension with new flat roof with parapet type design, make minor alterations including adjustment of existing front driveway, and all associated site works.

No.69 Alderbrook , Frankfield , Cork

308m
184299CONDITIONAL6 Feb 2018

Retention of 2 no. extensions to the existing Materials Recovery facility, associated modification to the facade and all ancillary site development works. The proposed development comprises of an activity requiring a Waste Licence.

Forge Hill , Ballycurreen , Co. Cork

308m
185176CONDITIONAL10 May 2018

An expansion to facilitate an increase in tonnage to 100,000 tonnes per annum of an existing Materials Recovery Facility. The proposed development will consist of 2 no. extensions to the existing waste handling building to allow for a proposed waste reception area, associated modifications to the facade, 1 no. diesel tank, external storage of ferrous and non ferrous metals, modifications to the site entrance including a new gate, fencing and all ancillary site development works. The Proposed development comprises of an activity requiring an Industrial Emissions Directive License. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application.

Forge Hill , Ballycurreen , Co. Cork

345m
175543CONDITIONAL20 Jun 2017

Construction of dwellinghouse (change of design from that granted under Planning Reg No. 14/4697 and Planning Reg No. 15/6883) including all associated site works

Site No. 3 Hampstead , Ballycurreen , Frankfield

346m
2241399CONDITIONAL14 Sept 2022

Permission is sought for an attic conversion with a new dormer window to the rear of the house, new and relocated solar panels, elevational alterations, new windows, all to existing dwelling, and all other ancillary site development works.

3 Hampstead , Ballycurreen , Cork

362m
2241608CONDITIONAL6 Dec 2022

Permission for the installation of a 215.8 kWp Rooftop Solar Photovoltaic Array extension (circa 1,020m2), consisting of circa 520 No. panels, to an existing Rooftop Solar Photovoltaic Array (circa 1032m2), with the proposed panels mounted directly on the roof surface, electrically connected to the existing electrical plant room via 4 No. inverters mounted on the wall of the existing plant room, located to the rear of the existing factory building and all associated work.

Avoncourt Packaging Ltd , Unit 2 Ballycurreen Industrial Estate , Airport Road

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?