2548
CONDITIONALGalway - Galway County Council
Proposed Development
for a first floor attic storage area, the retention of an existing detached garage storage area
View the full application file on the council's planning portal →Application Timeline
Application received
26 Mar 2025
Decision: CONDITIONAL
13 May 2025
Decision due
20 May 2025
Grant issued
24 Jun 2025
Application Details
- Location
- Na Foraí Maola Thoir , Barna , Co. Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway County Council
- Site Area
- 0.3915 ha
Timeline
- Registration Date
- 26 March 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 May 2025
- Grant Date
- 24 June 2025
- Permission Expires
- 23 June 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
chun na haithreacha a rinne mé ar teach conaithe agus garáiste a choinneail agus chun córas séarchais nua a thógail, chomh maith le gach obair eile a bhaineann leis an fhorbairt a dheanamh
No Foraí Maola Thoir , Bearna , Co Galway
for development to consist of 1) construction of front porch; 2) construction of shed; 3) retention of alterations to extension previously granted under 07/3572 and 12/1299. Gross floor space of proposed works 50 sqm
Barna ,
to construct a new dwelling house (200 sqm), garage (19 sqm), wastewater treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works: House 200 sqm , Garage 19sqm.
Forramoyle East ,
chun Teach nua cónaithe a thógáil chomh maith le Garáiste agus Córás searachais nua ag an seoladh thuas. Spás urláir comhlán na n-oibreacha beartaithe: 158.14 sqm & 54 sqm
An Baile Nua , Bearna , Co na Gaillimhe
chun teach nua cónaithe a thógáil chomh maith le garáiste agus córás searachais nua
An Baile Nua , Bearna , Co na Gaillimhe
chun Teach nua cónaithe a thógáil chomh maith le Garáiste agus Córás searachais
An Baile Nua , Bearna , Co na Gaillimhe
for a new wastewater treatment system and raised polishing filter bed at a revised position, along with revised site boundaries to previously approved dwelling house (plan. Ref. 97/296). (Previous site boundary: 0.4067 Hectares, Revised Site boundary: 0.2484 Hectares), and all site services and landscaping works.
Forramoyle East ,
for the construction of a two storey four bedroom dwelling house, a domestic effluent treatment plant & percolation area and all associated site works including a new entrance
Na Foraí Maola Thoir , Barna , Co. Galway
for the construction of a two storey four bedroom dwelling house, a domestic effluent treatment plant & percolation area and all associated site works including a new entrance
An Foraí Maola Thoir , Barna , Co. Galway
for the construction of a two storey four bedroom dwelling house, a domestic effluent treatment plant and percolation area and all associated site works including a new entrance
An Foraí Maola Thoir , Barna , Co. Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?