2550119
UNCONDITIONALDonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF 21 TWO STOREY DWELLINGS AND REMOVAL OF SUB-STRUCTURES OF 5 NO. DWELLINGS PREVIOUSLY CONSTRUCTED AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING SERVICES ON SITE PREVIOUSLY CONSTRUCTED UNDER PLANNING REF. NO. 04/5825
View the full application file on the council's planning portal →Application Timeline
Application received
1 Sept 2025
Decision: UNCONDITIONAL
23 Oct 2025
Decision due
26 Oct 2025
Application Details
- Location
- HATTERSLY PARK , CHURCHLAND QUARTERS , CARNDONAGH
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Donegal County Council
- Site Area
- 0.867 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 1 September 2025
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 23 October 2025
- Permission Expires
- 11 September 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF 21 TWO STOREY DWELLINGS AND REMOVAL OF SUB-STRUCTURES OF 5NO. DWELLINGS PREVIOUSLY CONSTRUCTED AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING SERVICES ON SITE PREVIOUSLY CONSTRUCTED UNDER PLANNING REF NO. 04/5825
HATTERSLY PARK , CHURCHLAND QUARTERS , CARNDONAGH
CONSTRUCTION OF 21 TWO STOREY DWELLINGS AND REMOVAL OF SUB-STRUCTURES OF 5 NO. DWELLINGS PREVIOUSLY CONSTRUCTED AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING SERVICES ON SITE PREVIOUSLY CONSTRUCTED UNDER PLANNING REF. NO. 04/5825
HATTERSLY PARK , CHURCHLAND QUARTERS , CARNDONAGH
CONSTRUCTION OF 21 TWO STOREY DWELLINGS AND REMOVAL OF SUB-STRUCTURES OF 5NO. DWELLINGS PREVIOUSLY CONSTRUCTED AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING SERVICES ON SITE PREVIOUSLY CONSTRUCTED UNDER PLANNING REF NO. 04/5825
HATTERSLY PARK , CHURCHLAND QUARTERS , CARNDONAGH
(1) ERECTION OF A 58 BEDROOM NURSING HOME WITH AUXILLARY FACILITIES (2)PART DEMOLITION OF AND ERECTION OF A NEW EXTENSION TO CHURCHTOWN LODGE, A PROTECTED STRUCTURE AND CHANGE OF USE TO 10 BEDROOM RESPITE CARE FACILITY (3)CAR PARKING AND AMENDED VEHICULAR ACCESS AND (4)CONNECTION TO PUBLIC MAINS SERVICES
CHURCHLAND QUARTERS , CARNDONAGH , CO DONEGAL
GROUND FLOOR DEVELOPMENT CONSISTING OF: 1. A SINGLE STOREY EXTENSION TO ACCOMMODATE A NEW DINING AND DAY ROOM 2. PART DEMOLITION OF EXISTING GROUND FLOOR DAY/DINING ROOM AND RE-USE OF REMAINDER AS WARD, SLUICE, STORES, WC AND TEA STATION, INFILLING 2NO. EXISTING WINDOWS AND FORMING 1 NO NEW WINDOW 3. 1 NO WINDOW INFILLED IN EXISTING 4 BED WARD 4. 1 NO NEW DOOR AND WINDOW INSERTED INTO EXISTING PALLATIVE CARE ROOM 5. 9 NO EXISTING WINDOWS INFILLED TO FORM 3NO ASSISTED SHOWERS 6. EXISTING KITCHENETTE REUSED AS VISITOR ROOM AND STAFF WC WITH 1 NO WINDOW INFILLED 7. EXISTING 2 NO WCs REPLACED WITH 1 NO WC AND 2 NO WINDOWS INFILLED 8. EXISTING TOILETS REPLACED WITH NEW PATIENT WC AND 3 NO. WINDOWS INFILLED 9. NEW GLAZED DOOR TO EXISTING PALLATIVE CARE 10. TREATMENT ROOM/RECYCLING/SLUICE ROOM/WC REPLACED WITH NEW BEDROOM WITH 1 NO LARGE WINDOW, ASSISTED SHOWER WITH 2 NO WINDOWS INFILLED AND NEW STORE 11. PROVISION OF NEW RAMP TO ENTRANCE 12. INTERNAL MINOR REFURBISHMENTS AT GROUND FLOOR LEVEL 13. NEW 60,000 LITRE SINGLE STOREY FIRE-FIGHTING WATER STORAGE TANK 14. ASSOCIATED LANDSCAPE AND SITE DEVELOPMENT WORKS
CARNDONAGH COMMUNITY HOSPITAL , DERRY ROAD/CONVENT ROAD , CARNDONAGH
CHANGE OF USE OF EXISTING OUTHOUSE TO DOMESTIC DWELLING AND RENOVATION OF SAME WITH CONNECTION TO MAIN SEWER SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CHURCHTOWN , CHURCHLAND QUARTERS , CARNDONAGH
(1) RETENTION OF SHED, (2) RETENTION AND COMPLETION OF WORKS TO ANNEX, (3) CONSTRUCTION OF EXTENSION TO EXISTING DWELLING UNDER PLANNING REF. NO. 08/70884, (4) RAISING EXISTING ROOF LEVEL OF DWELLING TO PROVIDE FOR ADDITIONAL ACCOMMODATION ON FIRST FLOOR AND (5) ELEVATIONAL CHANGES, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
CHURCHTOWN , CHURCHLAND QUARTERS , CARNDONAGH LIFFORD PO
(1) USE PART OF EXISTING OUTDOOR HOUSE TRAINING AREA TO TRAIN PEOPLE IN THE SKILL OF HORSE RIDING PRIOR TO TAKING THEM ON A WILD WESTERN TRAIL RIDE (2) PROVISION OF DISABLED TOILET AND KITCHEN FACILITIES ON GROUND FLOOR OF EXISTING BUILDING (3) INSTALLATION OF WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
CHURCHLAND QUARTERS , CARNDONAGH , LIFFORD PO
SINGLE STOREY EXTENSION TO THE REAR OF WILDWEST INISHOWEN EQUESTRIAN CENTRE COMPRISING 6.82M DEPTH AND 23.54M LONG AND EAVES HEIGHT OF 4.82M RISING TO 5.95M AGAINST EXISTING BUILDING. THE EXTENSION IS USED FOR ‘DRY-GOODS’ STORAGE FOR HAY, SAWDUST AND SECURE PARKING FOR HORSE BOX AND NO WET SERVICES ARE INCLUDED
BALLYLOSKEY , CARNDONAGH , LIFFORD PO
(a) DEMOLITION OF EXISTING PORTACABIN, SHED AND SECURITY FENCE AND (b) PLANNING FOR NEW AGRICULTURAL SHED WITH WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, RELOCATION OF EXISTING SITE ENTRANCE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS
CHURCHLAND QUARTERS , CARNDONAGH , LIFFORD PO
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?