2550128
CONDITIONALDonegal - Donegal County Council
Proposed Development
EXTENSION OF FRONT ELEVATION (LOUNGE AREA) OF EXISTING DWELLING
View the full application file on the council's planning portal →Application Timeline
Application received
17 Sept 2025
Decision: CONDITIONAL
7 Nov 2025
Decision due
11 Nov 2025
Grant issued
10 Dec 2025
Application Details
- Location
- TIRODDY , RAMELTON , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
Timeline
- Registration Date
- 17 September 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 November 2025
- Grant Date
- 10 December 2025
- Permission Expires
- 9 December 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND PROVISION OF SEPTIC TANK
TIRODDY , RAMELTON , LETTERKENNY PO
DEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING HOUSE AND RECONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE AND CONNECTION TO EXISTING SEWAGE TREATMENT PLANT
TIRRODDY , GLENALLA , LETTERKENNY
(1) DEMOLITION OF EXISTING OUTHOUSES, (2) CONSTRUCTION OF A REPLACEMENT DRY STORAGE SHED AND (3) PLACEMENT OF A MOBILE HOME ON THE SITE (TO BE REMOVED AFTER THE COMPLETION OF NEARBY DWELLING HOUSE GRANTED UNDER PLANNING REF. NO. 20/51268)
BALLYHENNY , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE, DOMESTIC GARAGE, PROVISION OF MECHANICAL TREATMENT SYSTEM/SOIL POLISHING FILTER AND ALL ASSOCIATED SITE-WORKS
TIRODDY , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING HOUSE, DOMESTIC GARAGE, PROVISION OF MECHANICAL TREATMENT SYSTEM/SOIL POLISHING FILTER AND ALL ASSOCIATED SITE-WORKS
TIRODDY , RAMELTON , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND PROVISION OF A SEPTIC TANK
BALLYKENNY , RAMELTON , CO DONEGAL
DEMOLITION OF EXISTING FAMILY HOME THAT HAS DEFECTIVE BLOCK WORK AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE INCLUDING CONNECTION TO EXISTING SERVICES AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
BALLYKENNY , RAMELTON , CO. DONEGAL
1)CONSTRUCTION OF A NEW WASTEWATER TREATMENT PLANT (WWTP) IN THE TOWNLAND OF TIRRODDY WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING INTERNAL ACCESS ROAD, INLET WORKS, WWTP PROCESS TANKS, SLUDGE STORAGE TANKS, CHEMICAL STORAGE TANKS, ANCILLARY TREATMENT UNITS, ADMINISTRATION & ESB SUB-STATION BUILDING, SLUDGE PRESS BUILDING, INTERNAL PUMPING STATIONS, SURFACE WATER ATTENUATION POND, 2.4M HIGH BOUNDARY FENCE AROUND THE PERIMITER OF THE WWTP WORKS, 1.2M FENCING AROUND THE SITE BOUNDARY, ENTRANCE VIA AN EXISTING COILLTE ROADWAY AND ENTRANCE ONTO L-5612-1 AND WIDENING AND STRENGHTENING OF L-5612-1 2)CONSTRUCTION OF APPROXIMATELY 1,590M OF TREATED EFFLUENT OUTFALL PIPELINE IN THE TOWNLANDS OF TIRRODDY AND BROWNKNOE, INCLUDING APPROXIMATELY 160M MARINE SECTION & OUTFALL DIFFUSER LOCATED IN LOUGH SWILLY3) CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RAMELTON IN THE TOWNLAND OF RAMELTON INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, DEMOLITION OF EXISTING SINGLE-STOREY BUILDING, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, ESB SUB-STATION UNIT, RUBBLE STONE PERIMITER WALLS, NEW ENTRANCE ONTO CASTLE STREET, RECONSTRUCTION OF AN EXISTING STONE BOUNDARY WALL APPROXIMATELY 15M LONG ALONg CASTLE STREET AND CONNECTION TO EXISTING STORM OUTFALLS 4)CONSTRUCTION OF 1 NO. MAIN WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND STORAGE TANK & STRUCTURES, PUMP HOUSE BUILDING, RUBBLE STONE PERIMETER WALLS, ESB SUB-STATION UNIT, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW TURNING HAMMERHEAD AT THE END OF THE EXISTING TURNING CIRCLE AT ABBEY VIEW ESTATE, NEW ENTRANCE TO ABBEY VIEW ESTATE, TEMPORARY WORKING AREA DURING CONSTRUCTION AND CONNECTION TO EXISTING STORM OUTFALLS 5)CONSTRUCTION OF 1 NO. NETWORK WASTEWATER PUMPING STATION AT RATHMULLAN IN THE TOWNLAND OF RATHMULLAN & BALLYBOE INCLUDING ALL ANCILLARY DEVELOPMENT WORKS, FLOOD PROTECTION MEASURES, BELOW GROUND PUMPING STATION, STORAGE TANK & STRUCTURES, LOW-LEVEL CONTROL KIOSK, 7.6M HIGH ORNATE VENTILATION STACK, RUBBLE STONE PERIMETER WALLS, DEMOLITION OF AN EXISTING SUBTERRANEAN MUNICIPAL SEPTIC TANK, NEW ENTRANCE ONTO MAIN STREET, TEMPORARY WORKING AREA DURING CONSTRUCTION, TEMPORARY ENTRANCE ONTO MAIN STREET DURING CONSTRUCTION, RELOCATION AND UPGRADING OF EXISTING STORM DRAIN AND CONNECTION TO EXISTING STORM OUTFALL......
RAMELTON MILFORD AND RATHMULLAN , CO DONEGAL
RENOVATION, REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING FIRE DAMAGED DWELLING HOUSE CONSISTING OF NEW STOREY AND A HALF LIVING ACCOMMODATION DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES
DRUMHERRIVE , GLENALLA , LETTERKENNY
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DETACHED DOMESTIC GARAGE, NEW ACCESS LANEWAY, A SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CARN HIGH , RAMELTON , LETTERKENNY PO