2553
CONDITIONALKerry - Kerry County Council
Proposed Development
CREATE AN AGRICULTURAL ENTRANCE TO HIS LAND HOLDING
View the full application file on the council's planning portal →Application Timeline
Application received
10 Mar 2025
Decision: CONDITIONAL
2 May 2025
Decision due
4 May 2025
Grant issued
6 Jun 2025
Application Details
- Location
- SHANAWAY EAST , TARBERT , CO KERRY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 0.01 ha
Timeline
- Registration Date
- 10 March 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 2 May 2025
- Grant Date
- 6 June 2025
- Permission Expires
- 5 June 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECT AN AGRICULTURAL STORAGE SHED FOR STORING AGRICULTURAL FARM MACHINERY AT THE REAR OF DWELLING HOUSE
SHANAWAY EAST , TARBERT , CO KERRY
CONSTRUCT 2 NO UNDERGROUND SLURRY TANKS WITH SLATS
SHANAWAY EAST , TARBERT , CO KERRY
(a) construction of detached two storey dwelling with attached carport structure to side (east), (b) new vehicular entrance including alterations to existing roadside boundary, (c) new on-site waste water treatment system and (d) all ancillary site works
Tarmon East , Tarbert , Co. Kerry
RAISE THE LEVEL OF THE LAND BY IMPORTING LANDFILL TO INCLUDE SUBSOIL AND BUILDER’S RUBBLE
DOONARD UPPER , TARBERT , CO.KERRY
RAISE THE LEVEL OF THE LAND BY IMPORTING LANDFILL TO INCLUDE SUBSOIL AND BUILDERS RUBBLE ON HIS LAND
DOONARD UPPER , TARBERT , CO.KERRY
FOR (1) DEMOLITION OF A CUBICLE HOUSE AND (2) CONSTRUCTION OF AN EASY FEED SLATTED AND STRAW BEDDED CATTLE HOUSE WITH ASSOCIATED UNDERGROUND SLURRY TANKS AND RE-ROOFING OF CUBICLE HOUSE, ALL WITHIN THE SAME ROOF STRUCTURE
TARMON EAST , TARBERT , CO KERRY
THE CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ENTRANCE, DRIVEWAY, PACKAGED WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
TIERACLEA UPPER , TARBERT , CO. KERRY
RAISE THE LEVEL OF THE LAND BY IMPORTING LANDFILL TO INCLUDE SUBSOIL AND BUILDERS RUBBLE ON HIS LAND
DOONARD UPPER , TARBERT , CO KRRY
CONSTRUCT (A) DETACHED PART TWO STOREY, PART SINGLE STOREY DWELLING HOUSE WITH ATTACHED SINGLE STOREY DOMESTIC GARAGE (B) ON SITE WASTE WATER TREATMENT SYSTEM(C) RELOCATON OF EXISTING VEHICULAR ENTRANCE AND RELATED ALTERATIONS TO ROADSIDE BOUNDARY AND (D) ALL ASSOCIATED SITE WORKS
TIREACLEA LOWER , TARBERT , CO KERRHY
(A) DEMOLISH EXISTING PUMP HOUSE SHED TO SIDE OF EXISTING DWELLING (B) RENOVATE EXISTING DWELLING, INCLUDING ELEVATIONAL CHANGES AND CONSTRUCT 2 NO SINGLE STOREY/PART TWO STOREY EXTENSIONS TO SIDE AND REAR OF DWELLING (C) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW MECHANICAL AERATION UNIT AND SOIL POLISHING FILTER (D) ALL ASSOCIATED SITE WORKS
KILMURRILY HOUSE , KILMURRILY , TARBERT
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?