2558

N/A

Roscommon - Roscommon County Council

Proposed Development

Permission to construct a fully serviced private dwelling house with wastewater treatment system and garage/fuel shed to include all associated site works at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Aug 2025

  2. Further information requested

    10 Oct 2025

  3. Application withdrawn

    24 Apr 2026

Application Details

Location
Lisnagavragh , Rahara , Co. Roscommon.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Roscommon County Council
Site Area
0.231 ha
Floor Area
277.95 sq m
Residential Units
1

Timeline

Registration Date
18 August 2025
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
24 April 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2634N/A5 May 2026

Permission to construct a fully serviced private dwelling house with waste water treatment system and garage/fuel shed to include all associated site works (A Natura Impact Statement has been submitted to Roscommon County Council as part of this application) at

Lisnagavragh , Rahara , Co. Roscommon.

533m
20486CONDITIONAL19 Nov 2020

for demolition of old dwelling house on site, and for erection of new dwelling house and domestic garage, with septic tank and percolation area and ancillary site development works at

Grange , Curraghboy , Co Roscommon

533m
20436N/A21 Oct 2020

for demolition of old dwelling house on site, and for erection of new dwelling house and domestic garage, with septic tank and percolation area and ancillary site development works at

Grange , Curraghboy , Co Roscommon

533m
20467N/A10 Nov 2020

for demolition of old dwelling house on site, and for erection of new dwelling house and domestic garage, with septic tank and percolation area and ancillary site development works at

Grange , Curraghboy , Co Roscommon

762m
20412CONDITIONAL8 Oct 2020

for the construction of a dwelling house, domestic garage, the installation of a sewerage treatment unit and percolation area along with connections to all site services and all other associated site works at

Lisnagavragh Townland , Four Roads , Co Roscommon

819m
2660193CONDITIONAL28 Apr 2026

Permission for the following: 1. To demolish existing rear extension and outbuildings, 2. To refurbish existing house to include alterations to elevations, 3. To construct new side/rear extension to same, 4. To install upgraded treatment system and percolation area, 5. To carry out alterations to front boundary wall, including the removal of existing entrance and forming new site entrance along front boundary, and carry out all ancillary site development works at

Grange , Curraghboy , Co. Roscommon

1.1km
2360046CONDITIONAL11 Aug 2023

Permission for development consisting of the provision of a new prefabricated classroom together with all ancillary site works at

Scoil Aodain Lismoil , Lismoyle Curraghboy , Co. Roscommon

1.4km
17397CONDITIONAL28 Sept 2017

to construct a private dwelling house, a domestic garage and sewerage treatment system with all other site services at

Garrynphort , Dysart , Co. Roscommon.

1.4km
17294REFUSED30 Jun 2017

development consisting of extension to rear and to side of existing dwelling house and carrying out all ancillary site works at

Turrock Townland , Dysart , Co. Roscommon

1.5km
2460029CONDITIONAL25 Jan 2024

Permission for construction of a waste water treatment system & associated siteworks at an existing dwellinghouse at

Ballylion , Curraghboy , Co. Roscommon

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?