The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

2559

N/A

Kerry - Kerry County Council

Proposed Development

CONSTRUCT A NEW DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Details

Location
PARKAVONEAR , AGHADOE , KILLARNEY CO KERRY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kerry County Council
Site Area
0.38 ha

Timeline

Registration Date
14 March 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2595N/A22 Apr 2025

CONSTRUCT A NEW DWELLING HOUSE WITH ALL ASSOCIATED SITE WORKS

PARKAVONEAR , AGHADOE , KILLARNEY

214m
2660722N/A2 Aug 2026

We, Andrew Duggan & Kerri O’Connor, intend to apply to Kerry County Council for retention permission for a partially constructed garage structure as constructed on site. Furthermore, full planning permission is sought for the following development: (a) The completion of the aforementioned garage structure; (b) The partial demolition of existing extensions and annexes to the existing dwelling; (c) The full demolition of an existing garage/store structure; (d) The proposed construction of extensions to the existing dwelling; (e) The installation of a new wastewater treatment system and all associated ancillary site works, on our site at Nunstown, Aghadoe, Killarney, Co. Kerry

Nunstown , Aghadoe , Killarney

214m
22272CONDITIONAL11 Mar 2022

(A) DEMOLISH EXISTING DWELLING HOUSE WITH SHED/STORAGE (B) PLANNING PERMISSION TO CONSTRUCT A NEW DWELLING WITH GARAGE (C) PLANNING PERMISSION TO INSTALL A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE SERVICES

NUNSTOWN , AGHADOE , KILLARNEY

215m
23535CONDITIONAL11 May 2023

CONSTRUCT A CONTAINER TO BE USED AS RESIDENTIAL ACCOMMODATION ON A TEMPORARY BASIS WHILE THE HOUSE GRANTED UNDER PLANNING REFERENCE 22272 IS BEING CONSTRUCTED WITH ALL ASSOCIATED SITE SERVICES

NUNSTOWN , AGHADOE , KILLARNEY CO KERRY

288m
221127CONDITIONAL28 Oct 2022

(A) ERECT NEW DWELLING AND GARAGE, (B) CONSTRUCT NEW WASTEWATER TREATMENT SYSTEM AND ALL ASSOCAITED SITE WORKS

PARKAVONEAR , KILLARNEY , CO KERRY

310m
17263CONDITIONAL24 Mar 2017

THE DEVELOPMENT WILL CONSIST OF COMPLETION OF A PARTLY CONSTRUCTED DERELICT DWELLING HOUSE, COMPRISING (A) DEMOLITION OF PART OF EXISTING STRUCTURE, (B) INCORPORATION OF PART OF EXISTING STRUCTURE, (C) COMPLETION OF DWELLING TO NEW PROPOSED DESIGN (TO BE SINGLE STOREY OVER BASEMENT WITH ATTIC ACCOMMODATION), (D) PROVISION OF NEW WASTE WATER TREATMENT SYSTEM AND POLISHING FILTER IN LIEU OF EXISTING SEPTIC TANK, (D) CREATION OF NEW VEHICULAR ENTRANCE, TO REPLACE EXISTING SITE ENTRANCE AND (F) ALL ANCILLARY LANDSCAPING AND SITE WORKS

PARKAVONEAR , AGHADOE , KILLARNEY

321m
23746CONDITIONAL29 Jun 2023

(A) THE ERECTION OF A NEW DWELLING AND GARAGE, (B) PLANNING PERMISSION TO CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS

PARKAVONEAR , KILLARNEY , CO KERRY

343m
22348CONDITIONAL31 Mar 2022

(A) PLANNING PERMISSION TO CONSTRUCT A NEW ACCOMODATION (B) PLANNING PERMISSION TO CONSTRUCT ADDITIONAL CAR PARK SPACES FOR THE NEW STAFF ACCOMODATION AND ALL ASSOCIATED SITE WORKS

THE AGHADOE HEIGHTS HOTEL , AGHADOE , KILLARNEY

344m
23582CONDITIONAL23 May 2023

THE DEVELOPMENT WILL PRINCIPALLY CONSIST OF: THE PROVISION OF A NO. 4 STOREY EXTENSION TO THE REAR (NORTH) OF THE EXISTING HOTEL (C.2,060 SQ M) COMPRISING 30 NO. ADDITIONAL HOTEL BEDROOMS AND ANCILLARY SPA STORAGE/PLANT. THE DEVELOPMENT WILL INCREASE THE TOTAL NUMBER OF HOTEL BEDROOMS FROM 74 NO. TO 104 NO. THE DEVELOPMENT ALSO PROPOSES: A SINGLE STOREY SPA EXTENSION TO THE FRONT (SOUTH) OF THE HOTEL (C. 75 SQ M); AN OUTDOOR POOL AREA TO THE FRONT (SOUTH) OF THE HOTEL PRINCIPALLY COMPRISING A HYDRO-POOL MEASURING 8 METRES X 4.5 METRE; AN EXTERNAL PLANT ROOM TO THE SIDE (EAST) OF THE HOTEL (C. 15 SQ M); 18 NO. ADDITIONAL CAR PARKING SPACES; THE MINOR RELOCATION NORTHWARDS OF THE EXISTING TENNIS COURT, LANDSCAPING, EXTERNAL LIGHTING, AND ALL ASSOCIATED SITE WORKS. THE TOTAL GROSS FLOOR AREA OF THE HOTEL WILL INCREASE FROM 8,095 SQ M TO 10,245 SQ M

THE AGHADOE HEIGHTS HOTEL , AGHADOE , KILLARNEY

346m
1716CONDITIONAL13 Jan 2017

(A) DEMOLISH PART OF DWELLING 1 (RESIDENTIAL UNIT), (B) PLANNING PERMISSION TO DEMOLISH PART OF BUILDING 2 (APARTMENTS), (C) RELOCATE DUAL ENTRANCE TO DWELLING 1 AND BUILDING 2. (D) UPGRADE AND REDUCE FROM 8 TO 6 NUMBER OF EXISTING APARTMENTS GRANTED UNDER PLANNING REG. NO. 00/1070, (D) ALTERATIONS TO ELEVATIONS ON EXISTING APARTMENTS AND (E) ALTERATION OF EXISTING SITE LAYOUT, TO PROVIDE PARKING AND ALL ASSOCIATED SITE WORKS

PARKAVONEAR , AGHADOE , KILLARNEY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?