2560013

CONDITIONAL

Carlow - Carlow County Council

Proposed Development

to construct an extension to existing dwelling house, to renovate & make alterations to existing dwelling house, to upgrade existing sewage treatment system to epa guidelines, to demolish existing sheds with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jan 2025

  2. Further information requested

    10 Mar 2025

  3. Further information received

    23 Jul 2025

  4. Decision: CONDITIONAL

    15 Aug 2025

  5. Decision due

    19 Aug 2025

  6. Grant issued

    17 Sept 2025

Application Details

Location
Knockbarragh , Kildavin , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Site Area
0.449 ha
Floor Area
106.32 sq m
Residential Units
1

Timeline

Registration Date
22 January 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 August 2025
Grant Date
17 September 2025
Permission Expires
16 September 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

426m
17109CONDITIONAL6 Apr 2017

Permission to construct a dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works

Barragh , Kildavin , Co Carlow

426m
1819N/A24 Jan 2018

Permission for revisions to previously granted planning permission PL17/109, comprising of a revised design of dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works.

Barragh , Kildavin , Co.Carlow

426m
1841CONDITIONAL15 Feb 2018

Permission for revisions to previously granted planning permission PL17/109, comprising of a revised design of dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works.

Barragh , Kildavin , Co.Carlow

426m
17363N/A21 Dec 2017

Permission for revisions to previously granted planning permission PL17/109, comprising of a revised design of dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works.

Barragh , Kildavin , Co.Carlow

426m
1741N/A20 Feb 2017

Permission to construct a dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works

Barragh , Kildavin , Co Carlow

755m
2167CONDITIONAL1 Mar 2021

Construction of a two storey dwelling, detached garage, wastewater treatment system, bored well, new splayed entrance and all associated site development works

Knockbrack , Myshall , Co. Carlow

861m
21154CONDITIONAL30 Apr 2021

Permission for the construction of a new entrance to a site with an existing dwelling and all associated site works

Aclare , Myshall , Co. Carlow

863m
17177CONDITIONAL29 May 2017

The construction of a new single story extension to the rear and sideof existing bungalow, new site entrance, septic tank with soil percolation system and bored well, along with all associated site works. Area of existing bungalow : 47m2. Area of proposed extension : 143m2.

Aclare , Myshall , Co.Carlow

863m
17148N/A9 May 2017

The construction of a new single storey extension to the rear and side of existing bungalow, new site entrance, septic tank with soil percolation system and bored well, along with all associated works. Area of existing bungalow : 47m2. Area of proposed extension: 143m2.

Aclare , Myshall , Co.Carlow

863m
17160N/A19 May 2017

the construction a new single story extension to the rear and side of existing bungalow, new site entrance, septic tank with soil percolation system and bored well, along with all associated site works. Area of existing bungalow : 47m2. Area of proposed extension : 143m2

Aclare , Myshall , Co.Carlow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?